Revision history of "Reconstruction and refurbishment of the rural common room in Przeczno together with the reconstruction of the access road at the length of 80 m with pavement and parking in front of the building" (Q98858)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:1916:19, 13 October 2024DG Regio talk contribs 88,358 bytes −16 Changed label, description and/or aliases in pt
  • curprev 16:1916:19, 13 October 2024DG Regio talk contribs 88,374 bytes −477 Set a claim value: summary (P836): O escopo deste projeto é a reconstrução e adaptação da sala comum rural em Przecznie com a reconstrução da estrada de acesso com pavimento e estacionamento em frente ao edifício. Esta ação será realizada no âmbito da elaboração do programa de revitalização local do município de Łubianka, que indica a zona de Przeczno como uma zona que requer atividades de revitalização. O projeto de infraestrutura permitirá a realização de uma série de atividades «s...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:4216:42, 2 March 2023DG Regio talk contribs 86,457 bytes +7,911 Changed label, description and/or aliases in lv, da, it, bg, sk, et, ro, pt, hu, hr, cs, fr, sv, es, lt, de, ga, nl, sl, fi, mt, el, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 10:0010:00, 26 July 2022DG Regio talk contribs 76,429 bytes +46,893 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:5906:59, 1 December 2021DG Regio talk contribs 16,970 bytes +2,944 Created claim: summary (P836): Le projet porte sur la reconstruction et la rénovation du centre communautaire de Przeno ainsi que sur la reconstruction de la route d’accès avec chaussée et stationnement devant l’installation. Cette action sera mise en œuvre dans le cadre du développement du programme de revitalisation locale de la municipalité de Łubianka, qui identifie la zone de Przeczno comme une zone nécessitant des activités de revitalisation. Le projet d’infrastructure...
  • curprev 06:5906:59, 1 December 2021DG Regio talk contribs 14,026 bytes +245 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:1523:15, 15 October 2020DG Regio talk contribs 14,221 bytes +254 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:1523:15, 15 October 2020DG Regio talk contribs 13,967 bytes −240 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:1523:15, 15 October 2020DG Regio talk contribs 14,207 bytes +2,347 Created claim: summary (P836): The scope of this project is the reconstruction and retrofitting of the rural common room in Przecznie with the reconstruction of the access road with pavement and parking in front of the building. This action will be carried out in connection with the elaboration of the Local Revitalisation Programme for the Municipality of Łubianka, which indicates the area of Przeczno as an area requiring revitalisation activities. The infrastructure project...
  • curprev 23:1523:15, 15 October 2020DG Regio talk contribs 11,860 bytes −2,141 Removed claim: summary (P836): The scope of this project is the renovation and retrofitting of the rural community at the same time as the construction of an access road with a walkway and a car park in front of the site. This will be done in connection with the development of a Local Revitality Programme for the Municipality of Łubianka, which identifies the area of the village to be repopulated as an area for regeneration. The infrastructure project will allow the impleme...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:2907:29, 6 March 2020DG Regio talk contribs 12,712 bytes +2,141 Created claim: summary (P836): The scope of this project is the renovation and retrofitting of the rural community at the same time as the construction of an access road with a walkway and a car park in front of the site. This will be done in connection with the development of a Local Revitality Programme for the Municipality of Łubianka, which identifies the area of the village to be repopulated as an area for regeneration. The infrastructure project will allow the implement...

24 February 2020

18 February 2020

31 January 2020

14 January 2020