Revision history of "Reconstruction of the premises together with the change of use of part of the building of the Municipal Cultural House for the creation of the daily residence" (Q98691)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:5106:51, 13 October 2024DG Regio talk contribs 92,169 bytes −5 Changed label, description and/or aliases in pt
  • curprev 06:5106:51, 13 October 2024DG Regio talk contribs 92,174 bytes −159 Set a claim value: summary (P836): O projeto envolve a reconstrução das instalações juntamente com uma mudança no uso de uma parte da Casa Cultural Municipal para a criação da residência diária. Está igualmente prevista a aquisição dos equipamentos técnicos, teletécnicos e de mobiliário e hardware necessários. Parte das paredes divisórias será desmontada com a extensão dos invólucros existentes, todas as camadas de piso e revestimento de parede. A porta com armações e instalações san...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:4718:47, 2 March 2023DG Regio talk contribs 89,163 bytes +2,570 Changed label, description and/or aliases in da, sk, it, lv, et, ro, fi, cs, hu, sv, de, pt, hr, fr, bg, el, lt, es, nl, ga, sl, mt, and other parts

3 December 2022

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:5609:56, 26 July 2022DG Regio talk contribs 84,476 bytes +54,321 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 08:2208:22, 1 December 2021DG Regio talk contribs 17,566 bytes +3,134 Created claim: summary (P836): Le projet comprend la reconstruction des locaux ainsi qu’un changement dans l’utilisation de parties du bâtiment de la Maison municipale de la culture pour la création d’une maison de résidence. Il est également prévu d’acheter le matériel technique et télétechnique nécessaire ainsi que le mobilier et le matériel. Les parties des murs de cloison seront démolies avec l’extension de certains cadres existants, coiffant toutes les couches de revêtem...
  • curprev 08:2208:22, 1 December 2021DG Regio talk contribs 14,432 bytes +233 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:2500:25, 16 October 2020DG Regio talk contribs 14,639 bytes +218 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:2500:25, 16 October 2020DG Regio talk contribs 14,421 bytes −227 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:2500:25, 16 October 2020DG Regio talk contribs 14,648 bytes +2,676 Created claim: summary (P836): The project involves the reconstruction of the premises together with a change in the use of a part of the Municipal Cultural House for the creation of the daily residence. It is also planned to purchase the necessary technical, teletechnical and furniture and hardware equipment. Part of the partition walls will be dismantled with the extension of existing casings, all layers of flooring and wall cladding. The door with frames and sanitary, elec...
  • curprev 00:2500:25, 16 October 2020DG Regio talk contribs 11,972 bytes −2,332 Removed claim: summary (P836): The project involves the conversion of premises, together with a change in the use of the part of the urban building of the Urban House with a view to the creation of a daily living area. The purchase of necessary technical and telecommunications equipment and furniture is also planned. The parts of the partition walls will be brought together with the extension of the existing parts of the walls, to the collection of all layers of floor and t...

25 September 2020

23 September 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:2507:25, 6 March 2020DG Regio talk contribs 13,023 bytes +2,332 Created claim: summary (P836): The project involves the conversion of premises, together with a change in the use of the part of the urban building of the Urban House with a view to the creation of a daily living area. The purchase of necessary technical and telecommunications equipment and furniture is also planned. The parts of the partition walls will be brought together with the extension of the existing parts of the walls, to the collection of all layers of floor and to...

24 February 2020

18 February 2020

31 January 2020

14 January 2020