Revision history of "Construction and equipment of three care and educational facilities in Włocławek" (Q98690)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:5106:51, 13 October 2024DG Regio talk contribs 90,695 bytes +2 Changed label, description and/or aliases in pt
  • curprev 06:5106:51, 13 October 2024DG Regio talk contribs 90,693 bytes +13 Set a claim value: summary (P836): Projeto Bn: A «construção e equipamento de três instituições de prestação de cuidados e de ensino em Włocławek» é a primeira fase do investimento em infraestruturas sociais com base nas disposições da Lei relativa ao apoio à família e ao acolhimento familiar. O âmbito da primeira fase inclui a construção de 3 edifícios unifamiliares, térreos, com terraços que cumprem as funções de instalações de cuidados e educação, juntamente com as infraestruturas...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:5609:56, 26 July 2022DG Regio talk contribs 85,374 bytes +55,635 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 08:2208:22, 1 December 2021DG Regio talk contribs 17,421 bytes +3,042 Created claim: summary (P836): Projet intitulé: «La construction et l’équipement de trois établissements de soins et de soins à Włocławek» est la première étape de l’investissement dans les infrastructures sociales, sur la base des dispositions de la loi sur le système d’aide aux familles et de soins de remplacement. La première étape comprend la construction de 3 bâtiments unifamiliaux au rez-de-chaussée avec terrasses assurant les fonctions d’infirmier et d’éducation, ainsi...
  • curprev 08:2208:22, 1 December 2021DG Regio talk contribs 14,379 bytes +155 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:1400:14, 16 October 2020DG Regio talk contribs 14,664 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:1400:14, 16 October 2020DG Regio talk contribs 14,523 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:1400:14, 16 October 2020DG Regio talk contribs 14,657 bytes +2,834 Created claim: summary (P836): Project Bn: “Construction and equipping three care and educational institutions in Włocławek” is the first stage of investment in social infrastructure based on the provisions of the Act on supporting family and foster care. The scope of the first stage includes the construction of 3 single-family, ground-family buildings with terraces fulfilling the functions of care and educational facilities, together with the necessary technical infrastructu...
  • curprev 00:1400:14, 16 October 2020DG Regio talk contribs 11,823 bytes −2,303 Removed claim: summary (P836): Project pn: ‘The construction and equipping of the three institutions providing care for Włocławek’ is the first stage of investment in social infrastructure on the basis of the provisions of the Act on family support and foster care. The scope of Phase I includes the construction of 3 single-family buildings with terraces that perform the functions of residential care and educational establishments, together with the necessary technical infra...

25 September 2020

23 September 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:2507:25, 6 March 2020DG Regio talk contribs 12,839 bytes +2,303 Created claim: summary (P836): Project pn: ‘The construction and equipping of the three institutions providing care for Włocławek’ is the first stage of investment in social infrastructure on the basis of the provisions of the Act on family support and foster care. The scope of Phase I includes the construction of 3 single-family buildings with terraces that perform the functions of residential care and educational establishments, together with the necessary technical infrast...

24 February 2020

18 February 2020

31 January 2020

14 January 2020