Revision history of "“Reconstruction and extension of voivodship road No. 559 on the section Lipno-Kamień Kotowy – voivodship border”" (Q98559)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:5006:50, 13 October 2024DG Regio talk contribs 94,257 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:5006:50, 13 October 2024DG Regio talk contribs 94,258 bytes +1,905 Set a claim value: summary (P836): O projeto prevê a reconstrução do DW n.o 559 no troço Lipno-Kemień Kotowy – fronteira do voivodato (22 093 km). The intersection of the roads of the transport of the roads- the construction of the transport of the roads is the preparation of the transport of the roads and the construction of the transport of the roads,- the construction of the roads and the culverts under them,- construction of road lighting was the construction of the roads;- alter...

22 March 2024

15 January 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1223:12, 2 March 2023DG Regio talk contribs 91,455 bytes −32,997 Changed label, description and/or aliases in da, it, sk, ga, et, lt, mt, fi, bg, lv, pt, cs, ro, sv, fr, de, hr, el, sl, es, nl, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:5309:53, 26 July 2022DG Regio talk contribs 122,338 bytes +89,516 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 07:1507:15, 1 December 2021DG Regio talk contribs 19,723 bytes +3,080 Created claim: summary (P836): Le projet prévoit la reconstruction de DW 559 sur le tronçon Lipno-Kemień Kotowy — frontière de la voïvodie (22,093 km). Prévu:- remplacement des structures de chaussée existantes,- construction de couches de reliure et d’abrasifs,- conversion au rond-point de l’intersection DW559 avec DW541- construction de pistes cyclables à pied,- construction de baies d’autobus,- construction de toboggans et ponceaux sous eux,- construction d’éclairage routi...
  • curprev 07:1507:15, 1 December 2021DG Regio talk contribs 16,643 bytes +190 Changed label, description and/or aliases in fr: translated_label

26 December 2020

29 October 2020

15 October 2020

  • curprev 23:5923:59, 15 October 2020DG Regio talk contribs 16,899 bytes +179 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:5923:59, 15 October 2020DG Regio talk contribs 16,720 bytes −180 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:5923:59, 15 October 2020DG Regio talk contribs 16,900 bytes +4,963 Created claim: summary (P836): The project envisages the reconstruction of DW No 559 on the section Lipno-Kemień Kotowy – voivodship border (22.093 km). The intersection of the roads of the transport of the roads- the construction of the transport of the roads is the preparation of the transport of the roads and the construction of the transport of the roads,- the construction of the roads and the culverts under them,- construction of road lighting was the construction of the...
  • curprev 23:5923:59, 15 October 2020DG Regio talk contribs 11,937 bytes −2,522 Removed claim: summary (P836): The project envisages the reconstruction of DW No. 559 on the section Lipno-Kamień Kotowy - province border (22,093 km). The following were planned: - replacement of existing pavement structures, - execution of a binding and wearing course, - reconstruction of the DW559 intersection with DW541 - construction of pedestrian and bicycle routes, - construction of bus bays, - construction of economic exits and culverts under them, - construction of...

25 September 2020

23 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0213:02, 10 March 2020Wildmax talk contribs 13,177 bytes −2,951 Changed claim: summary (P836): The project envisages the reconstruction of DW No. 559 on the section Lipno-Kamień Kotowy - province border (22,093 km). The following were planned: - replacement of existing pavement structures, - execution of a binding and wearing course, - reconstruction of the DW559 intersection with DW541 - construction of pedestrian and bicycle routes, - construction of bus bays, - construction of economic exits and culverts under them, - construction of r...
  • curprev 10:2510:25, 10 March 2020DG Regio talk contribs 16,128 bytes −5,473 Removed claim: summary (P836): The project envisages the reconstruction of DV No 559 on the section Linoe — Kakar — border of the province (22.093 km). Planned: — replacement of existing pavements, — implementation of the binding and sewage layers, — reconstruction of the roundabout to the intersection of the DW559 intersection with the DW541 road, — construction of bus bays; — construction of road junctions and culverts; — construction of road infrastructure in connection...
  • curprev 09:4009:40, 10 March 2020DG Regio talk contribs 21,601 bytes +5,473 Created claim: summary (P836): The project envisages the reconstruction of DV No 559 on the section Linoe — Kakar — border of the province (22.093 km). Planned: — replacement of existing pavements, — implementation of the binding and sewage layers, — reconstruction of the roundabout to the intersection of the DW559 intersection with the DW541 road, — construction of bus bays; — construction of road junctions and culverts; — construction of road infrastructure in connection wi...
  • curprev 09:3609:36, 10 March 2020DG Regio talk contribs 16,128 bytes +5,473 Created claim: summary (P836): The project envisages the reconstruction of DV No 559 on the section Linoe — Kakar — border of the province (22.093 km). Planned: — replacement of existing pavements, — implementation of the binding and sewage layers, — reconstruction of the roundabout to the intersection of the DW559 intersection with the DW541 road, — construction of bus bays; — construction of road junctions and culverts; — construction of road infrastructure in connection wi...

24 February 2020

18 February 2020

31 January 2020

14 January 2020