Revision history of "Construction of II° water filtration station in Łabiszyno and construction and reconstruction of sewage system in Łabiszyn – stage II" (Q98497)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:5106:51, 13 October 2024DG Regio talk contribs 71,370 bytes −23 Changed label, description and/or aliases in pt
  • curprev 06:5106:51, 13 October 2024DG Regio talk contribs 71,393 bytes +27 Set a claim value: summary (P836): O projeto previsto tem por objeto a construção e a reconstrução do sistema de esgotos e a construção da estação de filtração de água II° em Łabiszyno. O projeto será executado na aglomeração de Łabiszyn designada pela Resolução n.o IX/169/15 do Voivodato de Kujawsko-Pomorskie, Sejm, de 22 de junho de 2015, sobre a designação da aglomeração de Łabiszyn. O principal objetivo do projeto é reduzir o impacto negativo das águas residuais urbanas na qualid...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1223:12, 2 March 2023DG Regio talk contribs 68,196 bytes −464 Changed label, description and/or aliases in lv, it, da, sk, el, fi, hu, fr, ro, pt, et, sv, lt, ga, hr, sl, nl, de, es, mt, bg, cs, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 19:1219:12, 13 August 2022DG Regio talk contribs 66,543 bytes +42,091 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 07:1607:16, 1 December 2021DG Regio talk contribs 15,146 bytes +2,195 Created claim: summary (P836): Le projet envisagé a pour objet la construction et la reconstruction de systèmes d’assainissement et la construction d’une station de filtration de l’eau à Łabiszyn. Le projet sera mis en œuvre dans l’agglomération de Łabiszyn désignée par la résolution no IX/169/15 de l’Assemblée régionale de Kujawsko-Pomorskie du 22 juin 2015 sur la désignation de l’agglomération de Łabiszyn. L’objectif principal du projet est de réduire l’impact négatif des e...
  • curprev 07:1607:16, 1 December 2021DG Regio talk contribs 12,951 bytes +218 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:5823:58, 15 October 2020DG Regio talk contribs 13,173 bytes +198 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:5823:58, 15 October 2020DG Regio talk contribs 12,975 bytes −216 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:5823:58, 15 October 2020DG Regio talk contribs 13,191 bytes +2,099 Created claim: summary (P836): The object of the planned project is the construction and reconstruction of the sewage system and the construction of the II° water filtration station in Łabiszyno. The project will be implemented in the Łabiszyn agglomeration designated by resolution No. IX/169/15 of the Kujawsko-Pomorskie Voivodeship Sejm of 22 June 2015 on the designation of the Łabiszyn agglomeration.The main aim of the project is to reduce the negative impact of municipal w...
  • curprev 23:5823:58, 15 October 2020DG Regio talk contribs 11,092 bytes −1,404 Removed claim: summary (P836): The purpose of the planned project is the construction and reconstruction of the sewerage system and the construction of the water purification plant II in the Elbe. The project will be implemented in the Łabizyn agglomeration designated by Resolution No IX/169/15 of the Kujawsko-Pomorskie Regional Assembly of 22 June 2015. As a result of the actions taken, the state of the natural environment will improve, and in particular the chemical and e...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:1409:14, 6 March 2020DG Regio talk contribs 11,216 bytes +1,404 Created claim: summary (P836): The purpose of the planned project is the construction and reconstruction of the sewerage system and the construction of the water purification plant II in the Elbe. The project will be implemented in the Łabizyn agglomeration designated by Resolution No IX/169/15 of the Kujawsko-Pomorskie Regional Assembly of 22 June 2015. As a result of the actions taken, the state of the natural environment will improve, and in particular the chemical and eco...

24 February 2020

18 February 2020

31 January 2020

14 January 2020