Revision history of "Construction of a pressing sanitary collector from the Gostycyn commune to the sewage system of the City and Tuchola commune implemented in two stages" (Q98438)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4806:48, 13 October 2024DG Regio talk contribs 92,976 bytes +12 Changed label, description and/or aliases in pt
  • curprev 06:4806:48, 13 October 2024DG Regio talk contribs 92,964 bytes +50 Set a claim value: summary (P836): Este projeto consiste num investimento linear que consiste na construção de um sistema de drenagem de águas residuais sanitárias da estação de tratamento de águas residuais de Gostycin com interceção de condutas de descarga (Gosticin – Tuchola) de águas residuais da estação de bombagem de águas residuais existente em Łysków. O comprimento total da rede que será criada dentro do projeto é de 13 km. O coletor de exaustão será executado a partir da est...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1223:12, 2 March 2023DG Regio talk contribs 89,744 bytes +618 Changed label, description and/or aliases in lv, da, it, sk, fi, fr, et, ga, sv, ro, pt, es, de, bg, hu, el, cs, sl, hr, lt, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:5109:51, 26 July 2022DG Regio talk contribs 87,010 bytes +56,381 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 07:0607:06, 1 December 2021DG Regio talk contribs 17,716 bytes +3,121 Created claim: summary (P836): Le projet en question est un investissement linéaire consistant en la construction d’un système d’assainissement sanitaire pour la station de captage des eaux usées de Gostycin et l’interception des eaux usées de la station de pompage des eaux usées existante de Łysków via la ligne de rejet (Gostycin — Tuchola). La longueur totale du réseau à créer dans le cadre du projet est de 13 km. Le collecteur de décharges passera de la station centrale de...
  • curprev 07:0607:06, 1 December 2021DG Regio talk contribs 14,595 bytes +254 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:4023:40, 15 October 2020DG Regio talk contribs 14,781 bytes +210 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:4023:40, 15 October 2020DG Regio talk contribs 14,571 bytes −227 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:4023:40, 15 October 2020DG Regio talk contribs 14,798 bytes +2,790 Created claim: summary (P836): This project is a linear investment consisting of the construction of sanitary sewage drainage system of the sewage treatment plant in Gostycin with interception of discharge pipes (Gosticin – Tuchola) of sewage from the existing sewage pumping plant in Łysków. The total length of the network that will be created within the project is 13 km. The exhaust manifold will run from the central sewage pumping plant, located in the area planned to liqui...
  • curprev 23:4023:40, 15 October 2020DG Regio talk contribs 12,008 bytes −2,376 Removed claim: summary (P836): The project in question is a linear investment consisting of the construction of a sewage treatment plant in the water treatment plant in Gostycyn with interception of sewage from the existing sewage pumping station (Gostycyn — Tuchola) from the existing sewage pumping station in Łyskow. The total length of the net that the project will give up to 13 km. The compressor substation will run from a central sewage pumping station located in the ar...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:1309:13, 6 March 2020DG Regio talk contribs 13,103 bytes +2,376 Created claim: summary (P836): The project in question is a linear investment consisting of the construction of a sewage treatment plant in the water treatment plant in Gostycyn with interception of sewage from the existing sewage pumping station (Gostycyn — Tuchola) from the existing sewage pumping station in Łyskow. The total length of the net that the project will give up to 13 km. The compressor substation will run from a central sewage pumping station located in the area...

24 February 2020

18 February 2020

31 January 2020

14 January 2020