Revision history of "Improve the infrastructure of bus stops in Toruń by building a real-time passenger information system and modernising stops" (Q98408)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4806:48, 13 October 2024DG Regio talk contribs 67,422 bytes −513 Set a claim value: summary (P836): O principal objetivo, será alcançado até meados de 2021 em resultado da implementação das seguintes atividades interligadas:1) instalação de 73 informações de paragem dupla de autocarros de passageiros, transmitindo em tempo real mensagens no horário atual, equipadas com um módulo de mensagens de voz, dedicado às pessoas com deficiência:• quadro 12 linha – 10 locais• quadro 7 linha – 12 locais• quadro 5 linha – 51 locais 2) extensão do sistema centr...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1223:12, 2 March 2023DG Regio talk contribs 65,541 bytes +8,573 Changed label, description and/or aliases in lv, da, ro, fr, it, hr, el, bg, sk, cs, fi, sl, et, es, lt, de, hu, ga, sv, pt, nl, mt, and other parts

28 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:5009:50, 26 July 2022DG Regio talk contribs 54,866 bytes +31,803 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 07:0507:05, 1 December 2021DG Regio talk contribs 14,369 bytes +2,059 Created claim: summary (P836): L’objectif principal sera atteint d’ici la mi-2021 grâce à la mise en œuvre des actions interconnectées suivantes: 1) l’installation de 73 panneaux bilatéraux d’information sur l’arrêt des passagers, fournissant des messages en temps réel sur l’horaire actuel, équipés d’un module de prévisualisation vocale, dédié aux personnes handicapées:• le tableau 12 lignes — 10 emplacements• tableau 7 ligne — 12 emplacements• tableau 5 ligne — 51 emplacemen...
  • curprev 07:0507:05, 1 December 2021DG Regio talk contribs 12,310 bytes +225 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:4023:40, 15 October 2020DG Regio talk contribs 12,525 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:4023:40, 15 October 2020DG Regio talk contribs 12,341 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:4023:40, 15 October 2020DG Regio talk contribs 12,523 bytes +1,445 Created claim: summary (P836): The main objective, will be achieved by mid-2021 as a result of the implementation of the following interconnected activities:1) installation of 73 double passenger bus stop information, transmitting in real time messages on the current timetable, equipped with a voice message module, dedicated to disabled persons:• table 12 row – 10 locations• table 7 row – 12 locations• table 5 row – 51 locations 2) extension of the Central system for the mana...
  • curprev 23:4023:40, 15 October 2020DG Regio talk contribs 11,078 bytes −1,288 Removed claim: summary (P836): The main objective will be reached by mid-2021 as a result of the implementation of the following interlinked actions: (1) installation of 73 regular bilateral passenger transport tables, which are equipped with a voice announcement module, dedicated to disabled persons:• Table 12, the line announcement module, dedicated to disabled persons:• Table 10, the line message 7 to be located• 12 “line 51” location• line 5 for urban transport buses an...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:2309:23, 6 March 2020DG Regio talk contribs 11,085 bytes +1,288 Created claim: summary (P836): The main objective will be reached by mid-2021 as a result of the implementation of the following interlinked actions: (1) installation of 73 regular bilateral passenger transport tables, which are equipped with a voice announcement module, dedicated to disabled persons:• Table 12, the line announcement module, dedicated to disabled persons:• Table 10, the line message 7 to be located• 12 “line 51” location• line 5 for urban transport buses and...

24 February 2020

18 February 2020

31 January 2020

14 January 2020