Revision history of "Product innovation and production process of safety belts for passenger cars" (Q9838)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4806:48, 13 October 2024DG Regio talk contribs 53,502 bytes +36 Set a claim value: summary (P836): O objetivo do projeto é introduzir a inovação de processos na produção de cintos de segurança, através da aquisição e instalação de uma linha de montagem recém-concebida com novos procedimentos de produção. Esta inovação permitirá a produção em série do produto inovador, ou seja, um guincho com um pré-interruptor SPR 4.1. É o inverso. Tal aumentará significativamente a variabilidade dos cintos de segurança equipados com a pré-comutação SPR 4.1, o qu...

7 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

26 July 2022

  • curprev 09:4909:49, 26 July 2022DG Regio talk contribs 50,799 bytes +29,190 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 07:4607:46, 2 December 2021DG Regio talk contribs 16,760 bytes +1,472 Created claim: summary (P836): Ziel des Projektes ist es, Prozessinnovationen bei der Herstellung von Sicherheitsgurten, dem Kauf und Einbau einer neu gestalteten Montagelinie mit neuen Produktionsprozessen einzuführen. Diese Innovationen ermöglichen die Massenproduktion eines innovativen Produkts, d. h. einer Winde mit SPR 4.1 Spanner. Es ist eine Umkehrung. Dies wird die Variabilität bei der Positionierung von Sicherheitsgurten, die mit dem SPR 4.1 Spanner ausgestattet sind...
  • curprev 07:4607:46, 2 December 2021DG Regio talk contribs 15,288 bytes +154 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 08:1808:18, 28 November 2021DG Regio talk contribs 15,134 bytes +1,522 Created claim: summary (P836): L’objectif du projet est d’introduire l’innovation des processus dans la production de ceintures de sécurité, l’achat et l’installation d’une ligne d’assemblage nouvellement conçue avec de nouveaux procédés de production. Ces innovations permettront la production en série d’un produit innovant, c’est-à-dire d’un treuil avec tendeur SPR 4.1. C’est un renversement. Cela augmentera considérablement la variabilité du positionnement des ceintures de...
  • curprev 08:0608:06, 28 November 2021DG Regio talk contribs 13,612 bytes +169 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 14:5414:54, 22 October 2020DG Regio talk contribs 13,893 bytes +1,404 Created claim: summary (P836): The aim of the project is to introduce process innovation within the production of safety belts, by purchasing and installing a newly designed assembly line with new production procedures. This innovation will enable the serial production of the innovative product, i.e. a winch with a pre-switch SPR 4.1. It’s the Reverse. This will significantly increase the variability of seat belts equipped with the SPR 4.1 pre-switch, which will strengthen th...
  • curprev 14:5414:54, 22 October 2020DG Regio talk contribs 12,489 bytes −956 Removed claim: summary (P836): The aim of the project is to introduce process innovation within the production of safety belts, by purchasing and installing a newly designed assembly line with new production procedures. This innovation will enable the serial production of the innovative product, i.e. a winch with a pre-switch SPR 4.1. It’s the Reverse. This will significantly increase the variability of seat belts equipped with the SPR 4.1 pre-switch, which will strengthen...
  • curprev 06:2306:23, 22 October 2020DG Regio talk contribs 13,445 bytes +135 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:2306:23, 22 October 2020DG Regio talk contribs 13,310 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label

2 September 2020

  • curprev 07:2207:22, 2 September 2020DG Regio talk contribs 13,447 bytes +956 Created claim: summary (P836): The aim of the project is to introduce process innovation within the production of safety belts, by purchasing and installing a newly designed assembly line with new production procedures. This innovation will enable the serial production of the innovative product, i.e. a winch with a pre-switch SPR 4.1. It’s the Reverse. This will significantly increase the variability of seat belts equipped with the SPR 4.1 pre-switch, which will strengthen th...

15 July 2020

6 June 2020

25 March 2020

19 March 2020

3 March 2020

11 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020