Revision history of "Construction of a walking-bike path Wąbrzeźno – Myśliwiec." (Q98302)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 84,048 bytes −5 Changed label, description and/or aliases in pt
  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 84,053 bytes −17 Set a claim value: summary (P836): Este projeto diz respeito à construção de um trilho de bicicletas a pé de 2,59 km de comprimento Wąbrzeźno-mysliwiec, que inclui a construção dos seguintes troços: 1) Episódio 1 – construção de uma ciclovia pedonal no troço Wąbrzeźno-mysliwiec ao longo da estrada distrital n.o 1715C com um comprimento de 2,49 km, 2) Secção 2 – construção de uma ciclovia pedonal em ul. Kętrzyński com um comprimento de 104,71 m (ligação com um caminho dentro da cidade...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1223:12, 2 March 2023DG Regio talk contribs 81,676 bytes +573 Changed label, description and/or aliases in ro, lv, fr, it, da, es, cs, et, ga, sk, lt, fi, sv, bg, hr, hu, sl, nl, pt, el, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:4709:47, 26 July 2022DG Regio talk contribs 78,979 bytes +51,093 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 07:0407:04, 1 December 2021DG Regio talk contribs 16,602 bytes +2,782 Created claim: summary (P836): Le projet en question concerne la construction d’une piste cyclable Wąbrzežno-Gagiwiec de 2,59 km de long, y compris la construction des tronçons suivants: 1) Épisode 1 — construction d’une piste cyclable piétonne sur le tronçon Wąbrzeźno-Gagiwiec le long de la route de district no 1715C d’une longueur de 2,49 km, 2) Section 2 — construction d’une piste cyclable à ul. Kętrzyński d’une longueur de 104,71 m (lien vers le sentier de la ville). L’in...
  • curprev 07:0407:04, 1 December 2021DG Regio talk contribs 13,820 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:3223:32, 15 October 2020DG Regio talk contribs 14,140 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:3223:32, 15 October 2020DG Regio talk contribs 14,018 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:3223:32, 15 October 2020DG Regio talk contribs 14,131 bytes +2,611 Created claim: summary (P836): This project concerns the construction of a 2.59 km long walking-bike trail Wąbrzeźno-mysliwiec, which includes the construction of the following sections: 1) Episode 1 – construction of a foot-bike path on the section Wąbrzeźno-mysliwiec running along the district road No.1715C with a length of 2.49 km, 2) Section 2 – construction of a walking-bike path at ul. Kętrzyński with a length of 104.71 m (connection with a path within the city). The in...
  • curprev 23:3223:32, 15 October 2020DG Regio talk contribs 11,520 bytes −2,111 Removed claim: summary (P836): The project relates to the construction of a 2.59 km long -km walking path, including the building of the following sections: 1) Section 1 — construction of a pedestrian path on the section No 1715C of 2.49 km long, and the construction of the ‘2 km’ section of the section No 2C on the section No C on the road. Kêtrzyński with a length of 104.71 m (a connection to a path on the city’s territory). The investment shall be included in the type of...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4507:45, 6 March 2020DG Regio talk contribs 12,344 bytes +2,111 Created claim: summary (P836): The project relates to the construction of a 2.59 km long -km walking path, including the building of the following sections: 1) Section 1 — construction of a pedestrian path on the section No 1715C of 2.49 km long, and the construction of the ‘2 km’ section of the section No 2C on the section No C on the road. Kêtrzyński with a length of 104.71 m (a connection to a path on the city’s territory). The investment shall be included in the type of p...

24 February 2020

18 February 2020

31 January 2020

14 January 2020