Revision history of "Comprehensive energy modernisation of the building of the Primary School in Wabcz" (Q98250)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4606:46, 13 October 2024DG Regio talk contribs 61,148 bytes −4 Changed label, description and/or aliases in pt
  • curprev 06:4606:46, 13 October 2024DG Regio talk contribs 61,152 bytes −23 Set a claim value: summary (P836): O projeto tem por objeto um investimento que consiste numa modernização energética profunda e abrangente do edifício de serviços públicos – a Escola Primária de Wabcz, através de: isolamento das paredes exteriores, modernização das paredes das fundações, aquecimento dos tectos, substituição das janelas e das portas exteriores, modernização do sistema de aquecimento e modernização da iluminação. O principal objetivo do projeto é aumentar a eficiência...

7 March 2024

15 January 2024

6 July 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:4609:46, 26 July 2022DG Regio talk contribs 56,142 bytes +34,579 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 06:5906:59, 1 December 2021DG Regio talk contribs 13,872 bytes +1,857 Created claim: summary (P836): L’objet du projet est un investissement consistant en une modernisation profonde et complète de l’énergie du bâtiment d’utilité publique — l’école primaire de Wabcz, à travers: isolation des murs extérieurs, modernisation des murs de fondation, réchauffement du plancher, remplacement des fenêtres et des portes extérieures, modernisation du système de chauffage et modernisation de l’éclairage. L’objectif principal du projet est d’accroître l’effi...
  • curprev 06:5906:59, 1 December 2021DG Regio talk contribs 12,015 bytes +141 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:1823:18, 15 October 2020DG Regio talk contribs 12,314 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:1823:18, 15 October 2020DG Regio talk contribs 12,174 bytes −127 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:1823:18, 15 October 2020DG Regio talk contribs 12,301 bytes +1,679 Created claim: summary (P836): The subject of the project is an investment consisting of a deep, comprehensive energy modernisation of the public utility building – the Primary School in Wabcz, through: insulation of external walls, modernisation of the foundation walls, warming of ceilings, replacement of windows and external doors, modernisation of heating system and modernisation of lighting. The main objective of the project is to increase the energy efficiency of the pub...
  • curprev 23:1823:18, 15 October 2020DG Regio talk contribs 10,622 bytes −1,188 Removed claim: summary (P836): The project consists of an investment in deep, comprehensive energy modernisation of a public building — the Primary School in Wabscz, by: insulation of external walls, modernisation of the foundation walls, insulation of the ceiling, replacement of windows and external doors, modernisation of the heating system and modernisation of lighting. The main objective of the project is to increase the energy efficiency of the public building through...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4407:44, 6 March 2020DG Regio talk contribs 10,528 bytes +1,188 Created claim: summary (P836): The project consists of an investment in deep, comprehensive energy modernisation of a public building — the Primary School in Wabscz, by: insulation of external walls, modernisation of the foundation walls, insulation of the ceiling, replacement of windows and external doors, modernisation of the heating system and modernisation of lighting. The main objective of the project is to increase the energy efficiency of the public building through th...

24 February 2020

18 February 2020

31 January 2020

14 January 2020