Revision history of "Comprehensive energy modernisation of the building of the rural common room and the OSP firehouse in Robaków" (Q98212)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 57,881 bytes +5 Changed label, description and/or aliases in pt
  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 57,876 bytes −51 Set a claim value: summary (P836): O objeto do projeto é um investimento que consiste numa modernização energética profunda e abrangente do edifício de utilidade pública, que é a sala comum rural, juntamente com o quartel dos bombeiros da OSP em Robaków, através de: isolamento das paredes exteriores, aquecimento dos tectos, aquecimento do piso do átrio e da lareira, modernização do sistema de aquecimento central existente, modernização da ventilação existente no edifício, obras no âm...

7 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1123:11, 2 March 2023DG Regio talk contribs 55,533 bytes +1,063 Changed label, description and/or aliases in lv, da, ro, fr, it, hr, el, bg, sk, cs, fi, sl, hu, et, es, lt, de, ga, sv, pt, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:4509:45, 26 July 2022DG Regio talk contribs 52,344 bytes +31,796 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 06:5906:59, 1 December 2021DG Regio talk contribs 13,406 bytes +1,664 Created claim: summary (P836): L’objet du projet est un investissement consistant en une modernisation énergétique approfondie et complète d’un bâtiment d’utilité publique, qui est un centre communautaire, ainsi que la caserne de pompiers du GRT à Robaków, à travers: le réchauffement des murs extérieurs, le réchauffement du toit, le réchauffement du sol de la salle commune et de la maison, la modernisation du système de chauffage central existant, la modernisation de la venti...
  • curprev 06:5906:59, 1 December 2021DG Regio talk contribs 11,742 bytes +188 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:1723:17, 15 October 2020DG Regio talk contribs 11,994 bytes +169 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:1723:17, 15 October 2020DG Regio talk contribs 11,825 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:1723:17, 15 October 2020DG Regio talk contribs 11,972 bytes +1,514 Created claim: summary (P836): The subject of the project is an investment consisting of a deep, comprehensive energy modernisation of the public utility building, which is the rural common room together with the OSP firehouse in Robaków, through: insulation of external walls, warming of ceilings, warming of the hall floor and firehouse, modernisation of the existing central heating system, modernisation of existing ventilation in the building, works in the scope of electrica...
  • curprev 23:1723:17, 15 October 2020DG Regio talk contribs 10,458 bytes −1,070 Removed claim: summary (P836): The project consists of an investment in deep, comprehensive energy modernisation of the public buildings of the community centre, together with the reins of the TSO in the Robow, by: insulation of external walls, insulation of the floor room, insulation of the floor room for the day-care centre and refills, modernisation of the existing central heating system, modernisation of the existing ventilation in the building, works for electrical ins...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4407:44, 6 March 2020DG Regio talk contribs 10,243 bytes +1,070 Created claim: summary (P836): The project consists of an investment in deep, comprehensive energy modernisation of the public buildings of the community centre, together with the reins of the TSO in the Robow, by: insulation of external walls, insulation of the floor room, insulation of the floor room for the day-care centre and refills, modernisation of the existing central heating system, modernisation of the existing ventilation in the building, works for electrical insta...

24 February 2020

18 February 2020

31 January 2020

14 January 2020