Revision history of "Thermal modernisation of the OSP building in Topólka" (Q98175)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 88,173 bytes +4 Changed label, description and/or aliases in pt
  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 88,169 bytes −52 Set a claim value: summary (P836): O projeto tem por objeto a modernização térmica do edifício OPS em Topólka. O projeto implementado pelo Município de Topólka pressupõe um conjunto abrangente de atividades destinadas a melhorar ao máximo a eficiência energética do edifício. Como resultado do projeto, as divisórias termomodernizadas cumprirão os requisitos para o coeficiente de transferência de calor U especificado para 2021. O projeto inclui: — isolamento de paredes exteriores com i...

22 March 2024

15 January 2024

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1123:11, 2 March 2023DG Regio talk contribs 85,827 bytes +1,315 Changed label, description and/or aliases in sk, it, da, lv, fi, fr, et, cs, ga, pt, sl, lt, bg, ro, hr, hu, nl, es, mt, sv, el, de, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 19:0919:09, 13 August 2022DG Regio talk contribs 82,386 bytes +53,069 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 January 2022

16 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 06:5206:52, 1 December 2021DG Regio talk contribs 17,034 bytes +3,017 Created claim: summary (P836): L’objet du projet est la thermomodernisation de la caserne de pompiers OPS à Topólka. Le projet mis en œuvre par la municipalité de Topólka prévoit une gamme complète d’activités visant à améliorer l’efficacité énergétique du bâtiment dans la mesure du possible. Grâce au projet, les cloisons thermomodernisées répondront aux exigences du coefficient de transfert de chaleur U spécifiée pour 2021. Le projet comprend: — isolation des murs extérieurs...
  • curprev 06:5206:52, 1 December 2021DG Regio talk contribs 14,017 bytes +123 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:2914:29, 17 October 2020DG Regio talk contribs 14,334 bytes +2,809 Created claim: summary (P836): The subject of the project is the thermal modernisation of the OPS building in Topólka. The project implemented by the Topólka Municipality assumes a comprehensive range of activities aimed at improving the energy efficiency of the building to the maximum possible extent. As a result of the project, the thermomodernised partitions will meet the requirements for the heat transfer coefficient U specified for 2021. The project includes: — insulatio...
  • curprev 14:2914:29, 17 October 2020DG Regio talk contribs 11,525 bytes −2,335 Removed claim: summary (P836): The purpose of the project is the thermal refurbishment of the OPs of the TSO in Tota. The project carried out by the River Totlka assumes a comprehensive range of activities aiming at improving the energy efficiency of the building to the maximum extent possible. As a result of the design of the thermomodernised bulkhead, they will meet the requirements of the heat transfer coefficient U laid down for 2021. the project includes: — insulation...

15 October 2020

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4407:44, 6 March 2020DG Regio talk contribs 12,588 bytes +2,335 Created claim: summary (P836): The purpose of the project is the thermal refurbishment of the OPs of the TSO in Tota. The project carried out by the River Totlka assumes a comprehensive range of activities aiming at improving the energy efficiency of the building to the maximum extent possible. As a result of the design of the thermomodernised bulkhead, they will meet the requirements of the heat transfer coefficient U laid down for 2021. the project includes: — insulation of...

24 February 2020

18 February 2020

31 January 2020

14 January 2020