Revision history of "Thermal modernisation of the building of the OSP firehouse in Krzywo Sądzy" (Q98167)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 49,704 bytes +25 Changed label, description and/or aliases in pt
  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 49,679 bytes −41 Set a claim value: summary (P836): O projeto pressupõe a termomodernização do edifício do Corpo de Bombeiros Voluntários em Krzywosądza. O escopo das obras inclui a execução do isolamento das paredes externas com sua pintura e a execução do isolamento do teto no edifício. O investimento resultará numa redução da procura de energia e das emissões de dióxido de carbono, o que contribuirá para melhorar o ambiente. As condições de utilização do edifício termomodernizado serão igualmente...

23 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1123:11, 2 March 2023DG Regio talk contribs 47,326 bytes −105 Changed label, description and/or aliases in da, it, sk, lv, et, hr, fi, es, ga, ro, fr, el, de, mt, lt, hu, sv, pt, cs, sl, nl, bg, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 19:0919:09, 13 August 2022DG Regio talk contribs 45,305 bytes +26,796 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 January 2022

16 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 06:5206:52, 1 December 2021DG Regio talk contribs 12,579 bytes +1,393 Created claim: summary (P836): Le projet comprend la thermomodernisation de la construction du service d’incendie volontaire à Krzywojza. La portée des travaux comprend l’exécution du réchauffement des murs extérieurs avec leur peinture et l’exécution du réchauffement du plafond dans le bâtiment. Grâce à l’investissement, il y aura une réduction de la demande d’énergie et une réduction des émissions de dioxyde de carbone, ce qui contribuera à l’amélioration de l’environnement...
  • curprev 06:5206:52, 1 December 2021DG Regio talk contribs 11,186 bytes +134 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 22:5622:56, 15 October 2020DG Regio talk contribs 11,492 bytes +134 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:5622:56, 15 October 2020DG Regio talk contribs 11,358 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:5622:56, 15 October 2020DG Regio talk contribs 11,500 bytes +1,326 Created claim: summary (P836): The project assumes the thermomodernisation of the building of the Volunteer Fire Department in Krzywosądza. The scope of the works includes the execution of insulation of the outer walls with their painting and the execution of insulation of the ceiling in the building. The investment will result in a reduction in energy demand and a reduction in carbon dioxide emissions, which will contribute to improving the environment. The conditions of use...
  • curprev 22:5622:56, 15 October 2020DG Regio talk contribs 10,174 bytes −871 Removed claim: summary (P836): The project involves the renovation of the Voluntary Fire Brigade building for the restoration of the building of the Voluntary Fire Service. The scope of work includes the insulation of the outer wall together with painting and the execution of the insulation of the ceiling in the building. Investment will result in a reduction in energy demand and a reduction in carbon emissions, which will help to improve the environment. The conditions for...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4407:44, 6 March 2020DG Regio talk contribs 9,778 bytes +871 Created claim: summary (P836): The project involves the renovation of the Voluntary Fire Brigade building for the restoration of the building of the Voluntary Fire Service. The scope of work includes the insulation of the outer wall together with painting and the execution of the insulation of the ceiling in the building. Investment will result in a reduction in energy demand and a reduction in carbon emissions, which will help to improve the environment. The conditions for u...

24 February 2020

18 February 2020

31 January 2020

14 January 2020