Revision history of "Installations of renewable energy systems in the city of Aleksandrów Kujawski" (Q98094)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:1816:18, 13 October 2024DG Regio talk contribs 57,614 bytes +2 Changed label, description and/or aliases in pt
  • curprev 16:1816:18, 13 October 2024DG Regio talk contribs 57,612 bytes +2 Set a claim value: summary (P836): O projeto consiste na criação de 13 microinstalações fotovoltaicas em edifícios privados e 4 microinstalações em edifícios públicos: Centro Municipal de Cultura, Escola Primária n.o 1, Escola Primária n.o 3 e Gabinete Municipal. Todas as instalações estão localizadas em Aleksandrów Kujawski. O projeto inclui igualmente trabalhos preparatórios, supervisão dos investidores e promoção do projeto. Os trabalhos preparatórios incluíram visões locais, audi...

23 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 19:0819:08, 13 August 2022DG Regio talk contribs 53,168 bytes +32,605 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 January 2022

16 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 06:5106:51, 1 December 2021DG Regio talk contribs 13,497 bytes +1,692 Created claim: summary (P836): Le projet consiste en la création de 13 micro-installations photovoltaïques sur des bâtiments privés et de 4 micro-installations sur des bâtiments publics: Centre culturel de la ville, école primaire no 1, école primaire no 3 et mairie. Toutes les installations sont situées à Aleksandrów Kujawski. Le champ d’application du projet comprend également les travaux préparatoires, la supervision des investisseurs et la promotion du projet. Les travaux...
  • curprev 06:5106:51, 1 December 2021DG Regio talk contribs 11,805 bytes +151 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 22:5522:55, 15 October 2020DG Regio talk contribs 12,094 bytes +137 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:5522:55, 15 October 2020DG Regio talk contribs 11,957 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:5522:55, 15 October 2020DG Regio talk contribs 12,077 bytes +1,542 Created claim: summary (P836): The project consists of creating 13 photovoltaic micro-installations on private buildings and 4 micro-installations on public buildings: Municipal Culture Centre, Primary School No. 1, Primary School No. 3 and Municipal Office. All installations are located in Aleksandrów Kujawski. The project also includes preparatory work, investor supervision and project promotion. The preparatory work included local visions, audits of energy demand and techn...
  • curprev 22:5522:55, 15 October 2020DG Regio talk contribs 10,535 bytes −1,122 Removed claim: summary (P836): The project consists of the creation of 13 micro-installations for private buildings and 4 micro-installation on public buildings: Urban Culture Centre, Primary School No 1, Primary School No 3 and City Hall. All installations are located in Aleksandrów Kujawski. Preparatory work, investor supervision and project promotion are also part of the scope of the project. The preparatory work included the local visions, the energy demand audits and t...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4307:43, 6 March 2020DG Regio talk contribs 10,371 bytes +1,122 Created claim: summary (P836): The project consists of the creation of 13 micro-installations for private buildings and 4 micro-installation on public buildings: Urban Culture Centre, Primary School No 1, Primary School No 3 and City Hall. All installations are located in Aleksandrów Kujawski. Preparatory work, investor supervision and project promotion are also part of the scope of the project. The preparatory work included the local visions, the energy demand audits and the...

24 February 2020

18 February 2020

31 January 2020

14 January 2020