Revision history of "Construction of photovoltaic micro-installations using RES in the Osielsko commune" (Q98089)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:1816:18, 13 October 2024DG Regio talk contribs 85,693 bytes +1 Changed label, description and/or aliases in pt
  • curprev 16:1816:18, 13 October 2024DG Regio talk contribs 85,692 bytes −73 Set a claim value: summary (P836): O projeto diz respeito à construção de unidades de produção de eletricidade (microinstalações) a partir de FER, ou seja, instalações fotovoltaicas em 4 edifícios públicos (escolas) em recursos municipais e 13 — aqui participando no projeto de propriedade privada, de acordo com uma análise executiva realizada para cada cliente individual e seleção dos tipos e parâmetros da instalação. Para o projeto, foram definidas relações causais entre situações n...

7 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 September 2022

26 July 2022

  • curprev 09:4209:42, 26 July 2022DG Regio talk contribs 82,108 bytes +53,044 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 06:5106:51, 1 December 2021DG Regio talk contribs 17,198 bytes +3,062 Created claim: summary (P836): Le projet concerne la construction d’unités de production d’électricité (micro-installations) à partir de SER, c’est-à-dire d’installations photovoltaïques sur quatre bâtiments publics (écoles) en ressources municipales et 13 propriétés privées participant au projet, conformément à l’analyse de mise en œuvre réalisée pour chaque client individuel et au choix des types et paramètres de l’installation. Pour le projet, des liens de causalité ont ét...
  • curprev 06:5106:51, 1 December 2021DG Regio talk contribs 14,136 bytes +165 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 22:5422:54, 15 October 2020DG Regio talk contribs 14,411 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:5422:54, 15 October 2020DG Regio talk contribs 14,270 bytes −130 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:5422:54, 15 October 2020DG Regio talk contribs 14,400 bytes +2,601 Created claim: summary (P836): The project concerns the construction of electricity generation units (micro-installations) from RES, i.e. photovoltaic installations on 4 public buildings (schools) in municipal resources and 13 – here participating in the private property project, according to an executive analysis carried out for each individual customer and selection of types and parameters of the installation. For the project, causal links between negative situations occurr...
  • curprev 22:5422:54, 15 October 2020DG Regio talk contribs 11,799 bytes −2,058 Removed claim: summary (P836): The project concerns the construction of units for the production of electricity (micro-installations) from RES, i.e. photovoltaic installations on the municipal 4-ch public buildings (schools) and 13, in the private project, in accordance with the executive analysis for each individual recipient and the selection of the types and parameters of the installation. For the project, there is a causal link between the negative situations in the pro...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4307:43, 6 March 2020DG Regio talk contribs 12,576 bytes +2,058 Created claim: summary (P836): The project concerns the construction of units for the production of electricity (micro-installations) from RES, i.e. photovoltaic installations on the municipal 4-ch public buildings (schools) and 13, in the private project, in accordance with the executive analysis for each individual recipient and the selection of the types and parameters of the installation. For the project, there is a causal link between the negative situations in the proje...

24 February 2020

18 February 2020

31 January 2020

14 January 2020