Revision history of "Installation of RES micro-installations on residential and public buildings in Lubień Kujawski commune" (Q98083)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:1123:11, 2 March 2023DG Regio talk contribs 63,413 bytes +608 Changed label, description and/or aliases in da, it, sk, fi, pt, hr, lv, fr, et, ga, sv, ro, lt, mt, hu, sl, el, bg, de, cs, nl, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 19:0819:08, 13 August 2022DG Regio talk contribs 60,686 bytes +37,724 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 January 2022

16 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 06:5106:51, 1 December 2021DG Regio talk contribs 14,391 bytes +2,039 Created claim: summary (P836): L’objectif principal du projet est d’augmenter la part des énergies renouvelables dans la production d’énergie en réalisant des investissements dans 45 micro-installations photovoltaïques d’une capacité électrique totale de 226,35 kWp (moyenne arithmétique de 5,03 kWp) et en installant 4 pompes à chaleur d’une capacité de 38,74 kWt. Le projet susmentionné permettra de réduire les coûts d’exploitation de l’électricité et de la chaleur et, par con...
  • curprev 06:5106:51, 1 December 2021DG Regio talk contribs 12,352 bytes +179 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 22:4022:40, 15 October 2020DG Regio talk contribs 12,613 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:4022:40, 15 October 2020DG Regio talk contribs 12,450 bytes −174 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:4022:40, 15 October 2020DG Regio talk contribs 12,624 bytes +1,836 Created claim: summary (P836): The main objective of the project is to increase the share of energy from renewable sources in energy production through investments in 45 photovoltaic micro-installations with a total electrical capacity of 226.35 kWp (artymetic average 5.03 kWp) and the assembly of 4 heat pumps with a capacity of 38.74 kWt. Thanks to the implementation of the project, the costs of electricity and heat will be reduced, and as a result, this will reduce CO2 into...
  • curprev 22:4022:40, 15 October 2020DG Regio talk contribs 10,788 bytes −1,353 Removed claim: summary (P836): The main objective of the project is to increase the share of energy from renewable sources in the production of energy by investing in 45 micro-installations with a combined electrical output of 226,35 kWp (art 5,03 kWp) and the installation of 4 heat pumps with a power output of 38,74 kWt. Thanks to the implementation of the project, the costs of operating electricity and heat will be reduced and CO2 will be reduced to the atmosphere. As a r...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4307:43, 6 March 2020DG Regio talk contribs 10,861 bytes +1,353 Created claim: summary (P836): The main objective of the project is to increase the share of energy from renewable sources in the production of energy by investing in 45 micro-installations with a combined electrical output of 226,35 kWp (art 5,03 kWp) and the installation of 4 heat pumps with a power output of 38,74 kWt. Thanks to the implementation of the project, the costs of operating electricity and heat will be reduced and CO2 will be reduced to the atmosphere. As a res...

24 February 2020

18 February 2020

31 January 2020

14 January 2020