Revision history of "Improving the quality of primary and secondary education in the Nowa Ruda Municipality through the expansion of the School and Gymnassia Team with Integration Branches in Bożków" (Q96441)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:1316:13, 13 October 2024DG Regio talk contribs 80,913 bytes +1 Changed label, description and/or aliases in pt
  • curprev 16:1316:13, 13 October 2024DG Regio talk contribs 80,912 bytes −603 Set a claim value: summary (P836): The project concerns the expansion of the School-Gymnasian Team with the Integration Branches in Bożków with a school gym with a link and a classroom for natural subjects, together with the purchase of equipment.The building will be located in Bożków 89E in the Nowa Ruda Municipality.As a result of the investment from the created infrastructure of the gym and classroom will be able to use at the end 400 students of the ZSG in Borakków. building area...

7 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:4616:46, 2 March 2023DG Regio talk contribs 79,121 bytes +11,436 Changed label, description and/or aliases in lv, it, da, sk, pt, lt, sv, ro, hu, fi, fr, ga, es, bg, el, nl, sl, et, hr, cs, mt, de, and other parts

25 October 2022

21 October 2022

13 August 2022

  • curprev 18:5518:55, 13 August 2022DG Regio talk contribs 65,568 bytes +38,999 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:4606:46, 1 December 2021DG Regio talk contribs 16,200 bytes +2,429 Created claim: summary (P836): Le projet concerne l’agrandissement de l’équipe de l’école et du gymnase avec des sections d’intégration à Bożków avec une salle de gym scolaire avec un lien et une salle de classe d’objets naturels ainsi que l’achat d’équipement.Le bâtiment sera situé à Bożków 89E dans la municipalité de Nowa Ruda.Grâce à l’investissement de l’infrastructure de gymnase construite et la salle de classe sera en mesure d’utiliser 400 élèves du ZSG à Bożków. surfac...
  • curprev 06:4606:46, 1 December 2021DG Regio talk contribs 13,771 bytes +268 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 22:1022:10, 15 October 2020DG Regio talk contribs 13,943 bytes +239 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:1022:10, 15 October 2020DG Regio talk contribs 13,704 bytes −240 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:1022:10, 15 October 2020DG Regio talk contribs 13,944 bytes +1,959 Created claim: summary (P836): The project concerns the expansion of the School-Gymnasian Team with the Integration Branches in Bożków with a school gym with a link and a classroom for natural subjects, together with the purchase of equipment.The building will be located in Bożków 89E in the Nowa Ruda Municipality.As a result of the investment from the created infrastructure of the gym and classroom will be able to use at the end 400 students of the ZSG in Borakków. building...
  • curprev 22:1022:10, 15 October 2020DG Regio talk contribs 11,985 bytes −1,217 Removed claim: summary (P836): The project is related to the extension of the School and Gymnasium Team of the School of Integration to the school hall with a hyphen and a class of natural objects, together with the purchase of equipment. the building will be located in Bojzków 89E in the Gmina Nowa Ruda.In the result of the implementation of the investment from the gymnasium and classroom facilities will be able to benefit 400 ZSG students at Bojkowane.Technical parameters...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:1707:17, 6 March 2020DG Regio talk contribs 11,915 bytes +1,217 Created claim: summary (P836): The project is related to the extension of the School and Gymnasium Team of the School of Integration to the school hall with a hyphen and a class of natural objects, together with the purchase of equipment. the building will be located in Bojzków 89E in the Gmina Nowa Ruda.In the result of the implementation of the investment from the gymnasium and classroom facilities will be able to benefit 400 ZSG students at Bojkowane.Technical parameters:...

24 February 2020

18 February 2020

31 January 2020

14 January 2020