Revision history of "Reconstruction of St. Forest and St. Garden in Brzeg Dolny" (Q96091)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:1016:10, 13 October 2024DG Regio talk contribs 86,989 bytes −2 Changed label, description and/or aliases in pt
  • curprev 16:1016:10, 13 October 2024DG Regio talk contribs 86,991 bytes −18 Set a claim value: summary (P836): O projecto diz respeito à reconstrução de dois troços da rua. Floresta e St. Garden com um comprimento total de 580 m, localizado na área do histórico Palace-Park Team em Brzeg Dolny. A tarefa está incluída na LPR do município de Brzeg Dolny para os anos 2016-2023 BC. «Reconstrução de ul. Forest and Garden in Brzeg Dolny" e será implementado na zona selecionada para revitalização-subzona 5-Brzeg Dolny- Centrum. O âmbito material do projeto deve incl...

12 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0623:06, 2 March 2023DG Regio talk contribs 84,615 bytes +337 Changed label, description and/or aliases in da, sk, it, lv, es, cs, ga, fi, ro, fr, et, lt, hu, nl, mt, sv, hr, pt, bg, de, el, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:5708:57, 26 July 2022DG Regio talk contribs 82,166 bytes +52,902 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:3506:35, 1 December 2021DG Regio talk contribs 17,117 bytes +2,948 Created claim: summary (P836): Le projet concerne la reconstruction de deux tronçons routiers d’ul. Forêt et st. Jardin d’une longueur totale de 580 m situé dans la zone du palais historique et complexe de parc à Brzeg Dolny. La tâche est incluse dans le LPR de la municipalité de Brzeg Dolny pour les années 2016-2023 BN. «Reconstruction d’ul. Forêt et jardin à Brzeg Dolny" et seront mis en œuvre dans la zone sélectionnée pour la régénération — sous-zone 5-Brzeg Dolny- Centrum...
  • curprev 06:3506:35, 1 December 2021DG Regio talk contribs 14,169 bytes +124 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 17:4817:48, 15 October 2020DG Regio talk contribs 14,485 bytes +117 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4817:48, 15 October 2020DG Regio talk contribs 14,368 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4817:48, 15 October 2020DG Regio talk contribs 14,483 bytes +2,846 Created claim: summary (P836): The project concerns the reconstruction of two sections of the street. Forest and St. Garden with a total length of 580 m, located in the area of the historic Palace-Park Team in Brzeg Dolny. The task is included in the LPR of Brzeg Dolny commune for the years 2016-2023 BC. “Reconstruction of ul. Forest and Garden in Brzeg Dolny" and will be implemented in the area selected for revitalisation-sub-area 5-Brzeg Dolny- Centrum. The project’s materi...
  • curprev 17:4817:48, 15 October 2020DG Regio talk contribs 11,637 bytes −2,431 Removed claim: summary (P836): The project concerns the conversion of two stretches of road. And ul. A fence of a total length of 580 mb located in the area of the historical palace and park group in Brzeg Dolny. The task is entered in the LPR of the municipality of Brzeg Dolny for the period 2016-2023: ‘Reconstruction of Ulica Forestry and Horticultural Affairs in Brzeg Dolny” and will be carried out in the area selected for regeneration in the 5-Brzeg Dolny- Centrum area....

25 September 2020

23 September 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:2009:20, 6 March 2020DG Regio talk contribs 12,789 bytes +2,431 Created claim: summary (P836): The project concerns the conversion of two stretches of road. And ul. A fence of a total length of 580 mb located in the area of the historical palace and park group in Brzeg Dolny. The task is entered in the LPR of the municipality of Brzeg Dolny for the period 2016-2023: ‘Reconstruction of Ulica Forestry and Horticultural Affairs in Brzeg Dolny” and will be carried out in the area selected for regeneration in the 5-Brzeg Dolny- Centrum area. T...

24 February 2020

18 February 2020

31 January 2020

14 January 2020