Revision history of "Development of care and education facilities through reconstruction of the building at ul. Top 3 in Polkowice" (Q96006)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 86,767 bytes +3 Changed label, description and/or aliases in pt
  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 86,764 bytes −25 Set a claim value: summary (P836): O objetivo do projeto é adequar o edifício às funções assistenciais e educativas, em dois estabelecimentos (existentes e criados), através da sua reconstrução, renovação e equipamentos. Atualmente, o edifício dispõe de um centro social e de intervenção «Perspektywa» (10 lugares). Está prevista a criação de uma instituição de assistência social e educativa adicional e separada do tipo socialização (10 lugares). As instituições prestarão cuidados, ser...

20 March 2024

15 January 2024

6 July 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

26 July 2022

  • curprev 08:5508:55, 26 July 2022DG Regio talk contribs 82,159 bytes +52,958 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:2906:29, 1 December 2021DG Regio talk contribs 17,057 bytes +2,938 Created claim: summary (P836): L’objet du projet est d’adapter le bâtiment à des fonctions de soins et d’éducation, dans deux institutions (existantes et créées), par sa reconstruction, sa rénovation et son équipement. Actuellement, l’établissement dispose d’un centre social et d’intervention «perspektywa» (10 places). Il est prévu de créer un établissement d’accueil et d’éducation supplémentaire et distinct de type social (10 places). Les soins, l’éducation et les services t...
  • curprev 06:2906:29, 1 December 2021DG Regio talk contribs 14,119 bytes +189 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 17:4617:46, 15 October 2020DG Regio talk contribs 14,370 bytes +169 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4617:46, 15 October 2020DG Regio talk contribs 14,201 bytes −146 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4617:46, 15 October 2020DG Regio talk contribs 14,347 bytes +2,647 Created claim: summary (P836): The object of the project is to adapt the building to the care and educational functions, in two establishments (existing and created), through its reconstruction, renovation and equipment. Currently, the building has a social and intervention centre “Perspektywa” (10 seats). It is planned to create an additional, separate welfare and educational institution of the socialisation type (10 places). Institutions will provide care, educational and t...
  • curprev 17:4617:46, 15 October 2020DG Regio talk contribs 11,700 bytes −2,174 Removed claim: summary (P836): The aim of the project is to adapt the building to the care of a building, in two establishments (existing and created), through the reconstruction, renovation and equipment of the building. At this point in time, the facility operates the welfare and intervention centre ‘Prospects’ (10 places). An additional, separate care institution (10 places) is planned. Care, educational, therapeutic and child-specific services will be provided in establ...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:4007:40, 6 March 2020DG Regio talk contribs 12,591 bytes +2,174 Created claim: summary (P836): The aim of the project is to adapt the building to the care of a building, in two establishments (existing and created), through the reconstruction, renovation and equipment of the building. At this point in time, the facility operates the welfare and intervention centre ‘Prospects’ (10 places). An additional, separate care institution (10 places) is planned. Care, educational, therapeutic and child-specific services will be provided in establis...

24 February 2020

18 February 2020

31 January 2020

14 January 2020