Revision history of "Reconstruction of Świdnicka and Piłsudskiego Streets in Nowa Ruda as a link between the Sudecka Road and the city centre and the New-Russian WSEZ subzone INVEST PARK and road 385 to the border crossing in Translator" (Q95975)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:0323:03, 12 October 2024DG Regio talk contribs 92,850 bytes +4 Changed label, description and/or aliases in pt
  • curprev 23:0323:03, 12 October 2024DG Regio talk contribs 92,846 bytes −43 Set a claim value: summary (P836): O projeto diz respeito à reconstrução da estrada n.o 386 do Voivodato no troço desde o cruzamento com a terceira fase da estrada circular (ronda) em Ludwikowice Kłodzkie — com a estrada n.o 381 do Voivodato até à intersecção com ul. Cemitério de Nowa Ruda (DW no 385). O comprimento da estrada provincial reconstruída será de 3,81 km. A tarefa n.o 1 inclui: obras de construção, serviço de engenheiro contratado, estudo de viabilidade e documentação téc...

12 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0623:06, 2 March 2023DG Regio talk contribs 90,495 bytes +660 Changed label, description and/or aliases in it, da, sk, et, de, hr, bg, fi, es, ga, lv, pt, sv, cs, fr, hu, nl, el, ro, lt, sl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:5508:55, 26 July 2022DG Regio talk contribs 87,715 bytes +57,010 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:2906:29, 1 December 2021DG Regio talk contribs 17,738 bytes +3,048 Created claim: summary (P836): Le projet concerne la reconstruction de la route voïvodie no 386 depuis l’intersection avec la troisième étape du périphérique de Ludwikowice Kłodzkie — avec la route voïvodie no 381, jusqu’à l’intersection avec ul. Cimetière de Nowa Ruda (DW no 385). La longueur de la route provinciale reconstruite sera de 3,81 km. L’activité 1 comprend: travaux de construction, service d’ingénieur contractuel, développement de l’étude de faisabilité et de la d...
  • curprev 06:2906:29, 1 December 2021DG Regio talk contribs 14,690 bytes +271 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:2423:24, 15 October 2020DG Regio talk contribs 14,859 bytes +277 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:2423:24, 15 October 2020DG Regio talk contribs 14,582 bytes −252 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:2423:24, 15 October 2020DG Regio talk contribs 14,834 bytes +2,821 Created claim: summary (P836): The project concerns the reconstruction of the Voivodeship Road No 386 on the section from the junction with the third stage of the ring road (ronda) in Ludwikowice Kłodzkie – with the Voivodeship Road No. 381 to the intersection with ul. Cemetery in Nowa Ruda (DW no. 385). The length of the reconstructed provincial road will be 3.81 km. Task No 1 shall include: construction works, Contract Engineer service, feasibility study and technical docum...
  • curprev 23:2423:24, 15 October 2020DG Regio talk contribs 12,013 bytes −2,451 Removed claim: summary (P836): The project concerns the conversion of provincial road No 386 from the intersection with the III roundabout step of the bypass (roundabout) in Ludwigkowice Klodzkie road, to ul. ul. CSCF, New Ruda (DV No 385). The length of the reconstructed provincial road will be 3.81 km. Task No 1 includes: construction work, service of Contract Engineer, development of a feasibility study and technical documentation. The following changes shall be made to...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:3907:39, 6 March 2020DG Regio talk contribs 13,177 bytes +2,451 Created claim: summary (P836): The project concerns the conversion of provincial road No 386 from the intersection with the III roundabout step of the bypass (roundabout) in Ludwigkowice Klodzkie road, to ul. ul. CSCF, New Ruda (DV No 385). The length of the reconstructed provincial road will be 3.81 km. Task No 1 includes: construction work, service of Contract Engineer, development of a feasibility study and technical documentation. The following changes shall be made to th...

24 February 2020

18 February 2020

31 January 2020

14 January 2020