Revision history of "Reconstruction of St. Ścinawska, from the intersection with national road no. 3 (E65), Aleja Niepodległości, Lech Kaczyński Avenue and granite street to Jeronimo Martins Logistics Centre Distribution in Lubin" (Q95960)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:0323:03, 12 October 2024DG Regio talk contribs 91,396 bytes +18 Changed label, description and/or aliases in pt
  • curprev 23:0323:03, 12 October 2024DG Regio talk contribs 91,378 bytes +20 Set a claim value: summary (P836): O principal objetivo do projeto é melhorar as condições de tráfego e a capacidade de carga do pavimento rodoviário durante o transporte que liga o cruzamento com a estrada nacional n.o 3 (E65 pertencente à rede RTE-T) com o centro logístico Jeronimo Martins Distribution. A execução do investimento será o início do desenvolvimento da infraestrutura que conduz à fronteira com a Zona Económica Especial de Legnica. O projeto consistirá na reconstrução d...

23 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0623:06, 2 March 2023DG Regio talk contribs 88,964 bytes −587 Changed label, description and/or aliases in lv, da, it, sk, fi, ro, pt, sl, hu, et, fr, el, sv, ga, cs, nl, mt, lt, hr, bg, de, es, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 18:5118:51, 13 August 2022DG Regio talk contribs 87,431 bytes +56,662 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:2906:29, 1 December 2021DG Regio talk contribs 17,870 bytes +3,124 Created claim: summary (P836): L’objectif principal du projet est d’améliorer les conditions de circulation et la capacité de charge de la construction du revêtement routier sur la voie de transport reliant l’intersection avec la route nationale no 3 (E65 du réseau RTE-T) avec le centre logistique Jeronimo Martins Distribution. La mise en œuvre de l’investissement marquera le début de l’extension de l’infrastructure menant à la frontière avec la zone économique spéciale de Le...
  • curprev 06:2906:29, 1 December 2021DG Regio talk contribs 14,746 bytes +315 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:2323:23, 15 October 2020DG Regio talk contribs 14,871 bytes +272 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:2323:23, 15 October 2020DG Regio talk contribs 14,599 bytes −233 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:2323:23, 15 October 2020DG Regio talk contribs 14,832 bytes +2,822 Created claim: summary (P836): The main objective of the project is to improve the traffic conditions and load capacity of the road pavement during the transport linking the intersection with national road No 3 (E65 belonging to the TEN-T network) with the logistics centre Jeronimo Martins Distribution. The implementation of the investment will be the beginning of the development of infrastructure leading to the border with Legnica Special Economic Zone. The project will cons...
  • curprev 23:2323:23, 15 October 2020DG Regio talk contribs 12,010 bytes −2,356 Removed claim: summary (P836): The main objective of the project is to improve the traffic conditions and load capacity of road surface construction in the link between the intersection with national road No 3 (E65 of the TEN-T network) and the Jericho Marins Distribution logistics centre. The implementation of the investment will be the start of the development of the infrastructure leading up to the border with the Legnica Special Economic Zone. The project will be based...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:3907:39, 6 March 2020DG Regio talk contribs 13,084 bytes +2,356 Created claim: summary (P836): The main objective of the project is to improve the traffic conditions and load capacity of road surface construction in the link between the intersection with national road No 3 (E65 of the TEN-T network) and the Jericho Marins Distribution logistics centre. The implementation of the investment will be the start of the development of the infrastructure leading up to the border with the Legnica Special Economic Zone. The project will be based on...

24 February 2020

18 February 2020

31 January 2020

14 January 2020