Revision history of "CONSTRUCTION OF BICYCLE PATHS IN THE DISTRICTS OF TRZEBNICKA AND WOLÓW" (Q95915)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:0916:09, 13 October 2024DG Regio talk contribs 92,208 bytes +11 Changed label, description and/or aliases in pt
  • curprev 16:0916:09, 13 October 2024DG Regio talk contribs 92,197 bytes −11 Set a claim value: summary (P836): O objetivo do investimento é a construção de ciclovias com um comprimento total de cerca de 28,39 km, juntamente com a infraestrutura de acompanhamento. As ciclovias planeadas destinam-se a assegurar a continuidade do ciclismo nos Municípios, permitindo o acesso dos ciclistas às vias públicas, locais característicos e atrações turísticas da região, protegendo simultaneamente os recursos naturais e reduzindo a pressão sobre as áreas naturais valiosas...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0623:06, 2 March 2023DG Regio talk contribs 89,038 bytes +339 Changed label, description and/or aliases in lv, it, sk, da, fr, cs, fi, pt, et, ga, bg, sl, hu, ro, hr, mt, es, el, lt, nl, sv, de, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:5408:54, 26 July 2022DG Regio talk contribs 85,377 bytes +55,542 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:2806:28, 1 December 2021DG Regio talk contribs 17,404 bytes +3,136 Created claim: summary (P836): L’objectif de l’investissement est la construction de pistes cyclables d’une longueur totale d’environ 28,39 km, ainsi que l’infrastructure qui l’accompagne. Les itinéraires cyclables prévus visent à assurer la continuité du cyclisme dans les municipalités, en permettant aux cyclistes d’accéder aux voies publiques, aux lieux caractéristiques et aux attractions touristiques de la région, tout en protégeant les ressources naturelles et en réduisan...
  • curprev 06:2806:28, 1 December 2021DG Regio talk contribs 14,268 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:2223:22, 15 October 2020DG Regio talk contribs 14,571 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:2223:22, 15 October 2020DG Regio talk contribs 14,441 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:2223:22, 15 October 2020DG Regio talk contribs 14,564 bytes +2,865 Created claim: summary (P836): The object of the investment is the construction of bicycle routes with a total length of about 28.39 km together with accompanying infrastructure. The planned cycle routes are designed to ensure continuity of cycling in the Municipalities, allowing cyclists access to public roads, characteristic sites and tourist attractions of the region, while protecting natural resources and reducing pressure on natural valuable areas located in these three...
  • curprev 23:2223:22, 15 October 2020DG Regio talk contribs 11,699 bytes −2,310 Removed claim: summary (P836): The purpose of the investment is to construct a cycle route of approximately 28.39 km in length together with an accompanying infrastructure. Planned cycle routes are intended to ensure the continuity of cycling in Gminach, enabling cyclists to access the region’s public roads, sites and tourist attractions while protecting natural resources and reducing the pressure on the sites of those three municipalities. The project is a partnership proj...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:3607:36, 6 March 2020DG Regio talk contribs 12,722 bytes +2,310 Created claim: summary (P836): The purpose of the investment is to construct a cycle route of approximately 28.39 km in length together with an accompanying infrastructure. Planned cycle routes are intended to ensure the continuity of cycling in Gminach, enabling cyclists to access the region’s public roads, sites and tourist attractions while protecting natural resources and reducing the pressure on the sites of those three municipalities. The project is a partnership projec...

24 February 2020

18 February 2020

31 January 2020

14 January 2020