Revision history of "Construction of bicycle paths of the Średzki county on the trail of the Slężańska Way of St. ♪ Jacob ♪" (Q95910)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 92,040 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:4706:47, 13 October 2024DG Regio talk contribs 92,040 bytes +53 Set a claim value: summary (P836): O projeto tem por objeto a construção de dois troços de ciclovias no distrito de Średzki, com uma extensão de 1,864 km no município de Środa Śląsk e de 1,033 km no município de Kostomłoty (total: 2,897 km). O âmbito do projecto é o seguinte: 1. Documentação preparatória: Desenvolvimento do estudo de viabilidade. Desenvolvimento de um projecto técnico. 2. Construção da ciclovia – Ciechów Empresses:Obras de construção. Compre a terra. A sua supervisão...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0623:06, 2 March 2023DG Regio talk contribs 88,817 bytes +343 Changed label, description and/or aliases in it, da, sk, lv, et, hr, es, ga, fi, fr, ro, el, de, sv, pt, hu, lt, cs, sl, mt, nl, bg, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:5408:54, 26 July 2022DG Regio talk contribs 86,364 bytes +56,541 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:2806:28, 1 December 2021DG Regio talk contribs 17,545 bytes +3,086 Created claim: summary (P836): Le projet a pour objet la construction de deux tronçons de pistes cyclables dans la municipalité de Środa Śląska et de 1,033 km dans la commune de Kostomłoty (total: 2,897 km). La portée du projet est la suivante: 1. Documentation préparatoire: Étude de faisabilité. Développement d’une conception technique. 2. Construction d’une piste cyclable — Ciechów Cesarzowice:Roboty construction. Achat de terrains. Surveillance des investisseurs. Surveilla...
  • curprev 06:2806:28, 1 December 2021DG Regio talk contribs 14,459 bytes +156 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:2223:22, 15 October 2020DG Regio talk contribs 14,743 bytes +170 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:2223:22, 15 October 2020DG Regio talk contribs 14,573 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:2223:22, 15 October 2020DG Regio talk contribs 14,706 bytes +2,903 Created claim: summary (P836): The subject of the project is the construction of two sections of bicycle paths in the Średzki county with a length of 1.864 km in the Środa Śląsk Commune and 1.033 km in Kostomłoty Municipality (total: 2.897 km). The scope of the project is as follows: 1. Preparatory documentation: Development of the Feasibility Study. Development of a technical project. 2. Construction of the bicycle path – Ciechów Empresses:Building works. Buy out the land. I...
  • curprev 23:2223:22, 15 October 2020DG Regio talk contribs 11,803 bytes −2,499 Removed claim: summary (P836): The project consists of the construction of two sections of cycle paths in the 1.864 km long District of Upper Silesia in the Municipality of Central Silesia and 1.033 km in the Gmina Kodomłotá (combined: 2.897 km). The scope of the project is as follows: 1. Preparatory documentation: Development of a feasibility study. Development of a technical design. 2. Construction of the cycle path — Ciecha Cessizowice: construction work. Land grabbing....

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:3607:36, 6 March 2020DG Regio talk contribs 13,019 bytes +2,499 Created claim: summary (P836): The project consists of the construction of two sections of cycle paths in the 1.864 km long District of Upper Silesia in the Municipality of Central Silesia and 1.033 km in the Gmina Kodomłotá (combined: 2.897 km). The scope of the project is as follows: 1. Preparatory documentation: Development of a feasibility study. Development of a technical design. 2. Construction of the cycle path — Ciecha Cessizowice: construction work. Land grabbing. In...

24 February 2020

18 February 2020

31 January 2020

14 January 2020