Revision history of "Construction of sanitary sewage system and water supply network with water treatment station in Giebułtów." (Q95847)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 77,289 bytes +19 Changed label, description and/or aliases in pt
  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 77,270 bytes −87 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma rede sanitária e de abastecimento de água com uma estação de tratamento de água em Giebułtów, no âmbito do Programa Operacional Regional do Voivodato da Baixa Silésia para 2014-2020, Eixo Prioritário 4-4 Ambiente e Recursos, Ação 2-4,2 Gestão da água e das águas residuais, Submedida 3-4.2.3 Gestão da água e das águas residuais ZIT AJ. O objetivo global do projeto é organizar a gestão da água e das águas r...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0523:05, 2 March 2023DG Regio talk contribs 74,187 bytes −169 Changed label, description and/or aliases in da, it, et, sk, lt, fi, hr, es, pt, hu, lv, ro, fr, ga, sv, nl, de, bg, sl, el, mt, cs, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:5208:52, 26 July 2022DG Regio talk contribs 72,243 bytes +45,868 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:2323:23, 30 November 2021DG Regio talk contribs 15,872 bytes +2,631 Created claim: summary (P836): Le projet concerne la construction d’un réseau sanitaire et d’approvisionnement en eau doté d’une station de traitement de l’eau à Giebułtów dans le cadre du programme opérationnel régional pour la voïvodie de Basse-Silésie (ROP WD) pour la période 2014-2020, axe prioritaire 4-4 Environnement et ressources, mesure 2-4,2 Gestion de l’eau et des eaux usées, sous-mesure 3-4.2.3 Gestion de l’eau et des eaux usées ZIT AJ. L’objectif principal du proj...
  • curprev 23:2323:23, 30 November 2021DG Regio talk contribs 13,241 bytes +192 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:2914:29, 17 October 2020DG Regio talk contribs 13,489 bytes +2,305 Created claim: summary (P836): The subject of the project is the construction of a sanitary network and water supply network with water treatment station in Giebułtów as part of the Regional Operational Programme for the Lower Silesian Voivodship (WD’s RPO) for 2014-2020, Priority Axis 4-4 Environment and Resources, Action 2-4,2 Water and sewage management, Sub-measure 3-4.2.3 Water and sewage management ZIT AJ. The overarching objective of the project is to organise water an...
  • curprev 14:2914:29, 17 October 2020DG Regio talk contribs 11,184 bytes −1,846 Removed claim: summary (P836): The project consists of the construction of a sanitary and water network with a Water Treatment Station, in Giabułowo, in the framework of the Regional Operational Programme for Dolnośląskie Region (ROP ROP) 2014-2020, Priority Axis 4-4 Environment and Resources, Action 2-4.2 Management of water and wastewater management, Sub-action 3-4.2.3 ZIT economy AJ. The main aim of the project is to order the water and wastewater management in the suppl...

15 October 2020

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:3507:35, 6 March 2020DG Regio talk contribs 11,739 bytes +1,846 Created claim: summary (P836): The project consists of the construction of a sanitary and water network with a Water Treatment Station, in Giabułowo, in the framework of the Regional Operational Programme for Dolnośląskie Region (ROP ROP) 2014-2020, Priority Axis 4-4 Environment and Resources, Action 2-4.2 Management of water and wastewater management, Sub-action 3-4.2.3 ZIT economy AJ. The main aim of the project is to order the water and wastewater management in the supply...

24 February 2020

18 February 2020

31 January 2020

14 January 2020