Revision history of "Extension of the existing waste sorting line with a system of mechanical and biological waste treatment (composite and stabilisation), consisting of the construction of the Waste Separation and Management Plant in Wałbrzych on ul. I'm Beethoven." (Q95819)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 95,977 bytes +4 Changed label, description and/or aliases in pt
  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 95,973 bytes −88 Set a claim value: summary (P836): O projeto previsto consiste na extensão do atual sistema de linha de triagem de resíduos de musgo e no tratamento biológico de resíduos em Wałbrzych, nas parcelas n.os 7/16 e 7/17 Obręb 32 Gaj. O investimento será localizado numa parte da área não utilizada do aterro existente de resíduos não perigosos e inertes na ul. Beethoven em Wałbrzych. O investimento previsto inclui a construção de: — uma sala de triagem até 2 400 m2, altura até 11 m, para ap...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0523:05, 2 March 2023DG Regio talk contribs 92,891 bytes +756 Changed label, description and/or aliases in lv, sk, da, it, et, fi, cs, ro, hr, pt, sv, el, fr, lt, de, bg, es, hu, sl, nl, ga, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:5208:52, 26 July 2022DG Regio talk contribs 90,029 bytes +59,155 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:2223:22, 30 November 2021DG Regio talk contribs 17,869 bytes +3,093 Created claim: summary (P836): Le projet envisagé consiste en l’extension de la ligne de tri des déchets existante du système de traitement des déchets du mes et du biol à Wałbrzych sur les parcelles nos 7/16 et 7/17 Obręb 32 Gaj. L’investissement sera situé dans une partie de la zone inutilisée de la décharge existante de déchets non dangereux et inertes à ul. Beethoven à Wałbrzych. L’investissement prévu comprend la construction de: — hall de tri d’une superficie allant jus...
  • curprev 23:2223:22, 30 November 2021DG Regio talk contribs 14,776 bytes +338 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 23:0523:05, 15 October 2020DG Regio talk contribs 14,878 bytes +306 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:0523:05, 15 October 2020DG Regio talk contribs 14,572 bytes −311 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:0523:05, 15 October 2020DG Regio talk contribs 14,883 bytes +2,707 Created claim: summary (P836): The planned project consists of the extension of the existing waste sorting line system of moss and biol treatment of waste in Wałbrzych on plots no. 7/16 and 7/17 Obręb 32 Gaj. The investment will be located in a part of the unused area of the existing landfill of non-hazardous and inert waste at ul. Beethoven in Wałbrzych. The planned investment includes the construction of: — a sorting hall of up to 2.400 m², height of up to 11 m, for electri...
  • curprev 23:0523:05, 15 October 2020DG Regio talk contribs 12,176 bytes −2,304 Removed claim: summary (P836): The planned project consists of the extension of the existing waste water treatment line to the match and the waste of the waste treatment plant in Wałbrzych on plots Nos 7/16 and 7/17 of Gaj. The investment will be located in part of an area not used in the existing landfill for non-hazardous non-inert waste at ul. Beethoven in Wałbrzych. The planned investment shall consist of the building of: — sorting area of up to 2.400 m², out of up to 1...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:2607:26, 6 March 2020DG Regio talk contribs 13,193 bytes +2,304 Created claim: summary (P836): The planned project consists of the extension of the existing waste water treatment line to the match and the waste of the waste treatment plant in Wałbrzych on plots Nos 7/16 and 7/17 of Gaj. The investment will be located in part of an area not used in the existing landfill for non-hazardous non-inert waste at ul. Beethoven in Wałbrzych. The planned investment shall consist of the building of: — sorting area of up to 2.400 m², out of up to 11 ...

24 February 2020

18 February 2020

31 January 2020

14 January 2020