Revision history of "Limitation of motorised traffic in the centre of Milicz by building a bicycle ring road of the city" (Q95747)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4606:46, 13 October 2024DG Regio talk contribs 88,956 bytes −11 Changed label, description and/or aliases in pt
  • curprev 06:4606:46, 13 October 2024DG Regio talk contribs 88,967 bytes −132 Set a claim value: summary (P836): O objetivo do investimento é a construção de uma ciclovia junto ao rio Barycz e a sua ligação com a ciclovia existente em ul. Exército polaco em Milicz. Cerca de 90 % da área do município faz parte do Parque Paisagístico criado para proteger as zonas florestais e de lagoas. A área está localizada no rio Barycz. Atualmente, as zonas verdes do rio não são utilizadas. A fim de aumentar a acessibilidade, prevê-se conectá-los com os arredores a pé e cicl...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0523:05, 2 March 2023DG Regio talk contribs 86,707 bytes +3,549 Changed label, description and/or aliases in lv, it, da, sk, fi, ga, ro, et, sv, de, bg, fr, hu, cs, sl, mt, es, pt, nl, hr, lt, el, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 18:4918:49, 13 August 2022DG Regio talk contribs 81,040 bytes +51,713 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:2223:22, 30 November 2021DG Regio talk contribs 17,240 bytes +2,963 Created claim: summary (P836): L’objectif de l’investissement est la construction d’une piste cyclable par la rivière Barycz et sa connexion avec la piste cyclable existante à ul. Armée polonaise à Milicz. Environ 90 % de la superficie de la commune fait partie du parc paysager créé pour protéger les forêts et les étangs. La région est située au bord de la rivière Barycz. À l’heure actuelle, les zones vertes à proximité de la rivière ne sont pas aménagées. Afin d’accroître l’...
  • curprev 23:2223:22, 30 November 2021DG Regio talk contribs 14,277 bytes +186 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 22:4922:49, 15 October 2020DG Regio talk contribs 14,531 bytes +158 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:4922:49, 15 October 2020DG Regio talk contribs 14,373 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:4922:49, 15 October 2020DG Regio talk contribs 14,555 bytes +2,704 Created claim: summary (P836): The object of the investment is the construction of a foot-bike path by the river Barycz and its connection with the existing bicycle path at ul. Polish Army in Milicz. About 90 % of the area of the municipality is part of the Landscape Park created to protect forest and pond areas. The area is located on the river Barycz. Today, the river’s green areas are unused. In order to increase accessibility, it is envisaged to connect them with the surr...
  • curprev 22:4922:49, 15 October 2020DG Regio talk contribs 11,851 bytes −2,351 Removed claim: summary (P836): The purpose of the investment is to carry out a pedestrian path along the Barycz river and connect it to an existing bicycle path at ul. The Polish Army in Milu. Approximately 90 % of the area of the municipality is part of the Landscape Park for the protection of forest and pond areas. The site is located on the Barycz river. Currently the green areas of the river are not developed. In order to increase accessibility, it is envisaged to link...

25 September 2020

23 September 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:2507:25, 6 March 2020DG Regio talk contribs 12,922 bytes +2,351 Created claim: summary (P836): The purpose of the investment is to carry out a pedestrian path along the Barycz river and connect it to an existing bicycle path at ul. The Polish Army in Milu. Approximately 90 % of the area of the municipality is part of the Landscape Park for the protection of forest and pond areas. The site is located on the Barycz river. Currently the green areas of the river are not developed. In order to increase accessibility, it is envisaged to link th...

24 February 2020

18 February 2020

31 January 2020

14 January 2020