Revision history of "Construction of a power grid with SN voltage allowing connection of electricity generation units from RES in Smolec and Wrocław." (Q95406)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 81,220 bytes −15 Changed label, description and/or aliases in pt
  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 81,235 bytes −8 Set a claim value: summary (P836): No âmbito do projeto «Construção de uma rede elétrica com tensão SN que permita a ligação de unidades de produção de FER em Smolec e Wrocław», prevê-se que as obras de construção incluam: Construção de infra-estruturas SN por: — construção de 10,5 km da linha de cabos SN para alimentar a estação PZ, 3xXRUHAKXS 1x240 mm2 a partir das estações existentes GPZ 110/20 kV, — construção de dois troços da estação PZ 20 kV — equipamento da estação PZ com qua...

20 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:5018:50, 2 March 2023DG Regio talk contribs 78,849 bytes +1,046 Changed label, description and/or aliases in lt, hr, hu, fr, et, da, sl, cs, fi, pt, ro, sk, lv, de, mt, ga, sv, es, nl, el, it, bg, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:4408:44, 26 July 2022DG Regio talk contribs 74,481 bytes +47,694 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:0523:05, 30 November 2021DG Regio talk contribs 16,192 bytes +2,472 Created claim: summary (P836): Dans le cadre du projet «Construction d’un réseau électrique avec une tension de SN permettant le raccordement d’unités de production d’électricité à partir des SER à Smolec et à Wrocław», travaux de construction impliquant: Construction de l’infrastructure SN par: — construction de 10,5 km de ligne de câble SN pour alimenter la station PZ, 3xXRUHAKXS 1x240 mm² des stations existantes GPZ 110/20 kV, — construction de deux tronçons PZ 20 kV stati...
  • curprev 23:0523:05, 30 November 2021DG Regio talk contribs 13,720 bytes +236 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5421:54, 15 October 2020DG Regio talk contribs 13,924 bytes +189 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5421:54, 15 October 2020DG Regio talk contribs 13,735 bytes −192 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5421:54, 15 October 2020DG Regio talk contribs 13,927 bytes +2,342 Created claim: summary (P836): As part of the project “Construction of electricity grid with SN voltage allowing connection of RES generation units in Smolec and Wrocław” the construction works are planned to include: Construction of SN infrastructure by: — construction of 10.5 km of cable line SN to power PZ station, 3xXRUHAKXS 1x240 mm² from existing stations GPZ 110/20 kV, – construction of two section PZ station 20 kV – PZ station equipment with 20 kV switchboard – constr...
  • curprev 21:5421:54, 15 October 2020DG Regio talk contribs 11,585 bytes −2,068 Removed claim: summary (P836): Within the framework of the project “Construction of a SN power grid that allows the connection of units of electricity generation from RES in the area of Smolensk and Wroclaw”, works are planned for the construction of: Construction of SN infrastructure by: — construction of 10.5 km of the CI cable line to feed the PZ 110/20, 3xRUHAAKXS 1x240 mm² from existing GPZ kV station — construction of a two-sex station of PZ 20 kV — construction of a...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:1207:12, 6 March 2020DG Regio talk contribs 12,379 bytes +2,068 Created claim: summary (P836): Within the framework of the project “Construction of a SN power grid that allows the connection of units of electricity generation from RES in the area of Smolensk and Wroclaw”, works are planned for the construction of: Construction of SN infrastructure by: — construction of 10.5 km of the CI cable line to feed the PZ 110/20, 3xRUHAAKXS 1x240 mm² from existing GPZ kV station — construction of a two-sex station of PZ 20 kV — construction of a 20...

24 February 2020

18 February 2020

31 January 2020

14 January 2020