Revision history of "Construction and modernisation of the power grid with voltage SN and nN enabling connection of electricity generation units from RES in the municipality of Zgorzelec and Osiecznica" (Q95404)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 93,928 bytes −33 Changed label, description and/or aliases in pt
  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 93,961 bytes +29 Set a claim value: summary (P836): Objeto do projeto No âmbito do projeto «Construção e modernização da rede elétrica com tensão de SN e nN, permitindo a ligação de unidades de produção de eletricidade a partir de FER no município de Zgorzelec e Osiecznica», está previsto concluir a manutenção da transmissão com proprietários privados, a execução da documentação de conceção e os trabalhos de construção abrangendo 3 tarefas: Tarefa 1 – Modernização da rede SN no município de Zgorzelec...

12 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:5716:57, 2 March 2023DG Regio talk contribs 91,538 bytes −1,154 Changed label, description and/or aliases in lv, it, da, sk, sl, fi, de, et, pt, ro, fr, lt, sv, nl, mt, bg, cs, el, hr, es, ga, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:4408:44, 26 July 2022DG Regio talk contribs 89,359 bytes +58,729 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:0523:05, 30 November 2021DG Regio talk contribs 17,748 bytes +3,087 Created claim: summary (P836): Objet du projet «Construction et modernisation du réseau électrique avec une tension de SN et NN permettant le raccordement d’unités de production d’électricité à partir de SER dans la municipalité de Zgorzelec et d’Osiecznica», il est prévu de conclure la servitude de transmission avec des propriétaires privés, d’effectuer la documentation de conception et les travaux de construction couvrant 3 tâches: Tâche 1 — Modernisation du réseau SN dans...
  • curprev 23:0523:05, 30 November 2021DG Regio talk contribs 14,661 bytes +278 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 14,823 bytes +240 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 14,583 bytes −246 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 14,829 bytes +2,812 Created claim: summary (P836): Subject of the project Under the project “Construction and modernisation of the electricity grid with voltage of SN and nN, enabling connection of electricity generation units from RES in the municipality of Zgorzelec and Osiecznica” it is planned to complete the serviceability of the transmission with private owners, execution of design documentation and construction works covering 3 tasks: Task 1 – Modernisation of SN network in Zgorzelec comm...
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 12,017 bytes −2,336 Removed claim: summary (P836): The subject of the project “Construction and modernisation of the electricity grid with SN and NN voltage power grid allowing the connection of units of electricity generation from RES in the commune of Zgorzelec and Osiczenica” is intended to be achieved by means of an easement of transmission to private owners, the execution of project documentation and construction works covering 3 tasks: Activity 1 — Modernisation of the Supreme Court netw...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:1207:12, 6 March 2020DG Regio talk contribs 13,082 bytes +2,336 Created claim: summary (P836): The subject of the project “Construction and modernisation of the electricity grid with SN and NN voltage power grid allowing the connection of units of electricity generation from RES in the commune of Zgorzelec and Osiczenica” is intended to be achieved by means of an easement of transmission to private owners, the execution of project documentation and construction works covering 3 tasks: Activity 1 — Modernisation of the Supreme Court networ...

24 February 2020

18 February 2020

31 January 2020

14 January 2020