Revision history of "Installation for 400 kW photovoltaic power generation in the municipality of Kąty Wrocławskie" (Q95401)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 89,744 bytes +5 Changed label, description and/or aliases in pt
  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 89,739 bytes −115 Set a claim value: summary (P836): O principal objetivo do projeto é lançar a produção de eletricidade solar na AG Projekt, com a ligação da nova central fotovoltaica à rede de transporte. Os objetivos específicos do projeto são os seguintes: — aquisição, instalação e colocação em funcionamento de uma instalação fotovoltaica, — ligação da instalação à rede de distribuição de acordo com as condições de ligação da TAURON Dystrybucja S.A., — utilização de parte da eletricidade produzida...

22 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0423:04, 2 March 2023DG Regio talk contribs 87,460 bytes +3,055 Changed label, description and/or aliases in lv, it, ro, da, sv, fr, bg, ga, sk, hu, de, fi, mt, et, sl, nl, el, hr, es, lt, cs, pt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:4408:44, 26 July 2022DG Regio talk contribs 82,281 bytes +52,873 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:0523:05, 30 November 2021DG Regio talk contribs 17,255 bytes +3,026 Created claim: summary (P836): L’objectif principal du projet est de lancer la production d’électricité à partir du rayonnement solaire dans AG Projekt, avec la connexion de la nouvelle centrale photovoltaïque au réseau de transport. Les objectifs spécifiques du projet sont les suivants: — achat, installation et mise en service d’une installation photovoltaïque, — raccordement de l’installation au réseau de distribution selon les conditions de raccordement de TAURON Dystrybuc...
  • curprev 23:0523:05, 30 November 2021DG Regio talk contribs 14,229 bytes +199 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 14,470 bytes +154 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 14,316 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 14,479 bytes +2,714 Created claim: summary (P836): The main objective of the project is to launch the production of solar electricity at AG Projekt, with the connection of the newly created PV plant to the transmission grid. The specific objectives of the project shall be: — purchase, installation and commissioning of a photovoltaic installation, – connection of the installation to the distribution network in accordance with the connection conditions of TAURON Dystrybucja S.A., – the use of part...
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 11,765 bytes −2,346 Removed claim: summary (P836): The MAIN project is intended to mobilise the production of electricity from solar radiation in the company AG, a project to connect the installation of the photovoltaic power plant to the transmission grid. The specific objectives of the project shall be to: The purchase, installation and launch of the photovoltaic installation, the connection of the installation to the distribution network in accordance with the TAURON Danalacja S.A., — the u...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:1107:11, 6 March 2020DG Regio talk contribs 12,820 bytes +2,346 Created claim: summary (P836): The MAIN project is intended to mobilise the production of electricity from solar radiation in the company AG, a project to connect the installation of the photovoltaic power plant to the transmission grid. The specific objectives of the project shall be to: The purchase, installation and launch of the photovoltaic installation, the connection of the installation to the distribution network in accordance with the TAURON Danalacja S.A., — the use...

24 February 2020

18 February 2020

31 January 2020

14 January 2020