Revision history of "Development of photovoltaic micro-installations in the company" (Q95400)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 83,065 bytes −20 Set a claim value: summary (P836): O principal objetivo do projeto é expandir a atividade da recorrente para produzir eletricidade e calor a partir de fontes renováveis com ligação da produção de eletricidade à rede de distribuição/transporte. A energia será produzida tanto para fins próprios (principalmente) como para a revenda de eventuais excedentes. O projeto consiste na construção (incluindo a aquisição do equipamento necessário) de infraestruturas de produção de energia utiliza...

12 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:4408:44, 26 July 2022DG Regio talk contribs 78,294 bytes +50,505 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:0523:05, 30 November 2021DG Regio talk contribs 16,541 bytes +2,790 Created claim: summary (P836): L’objectif principal du projet est d’étendre l’activité de la requérante pour la production d’électricité et de chaleur à partir de sources renouvelables ainsi que la connexion de la production d’électricité au réseau de distribution/de transport. L’énergie sera produite à la fois pour l’autoconsommation (principalement) et pour la revente d’éventuels excédents. Le projet consiste en la construction (y compris l’achat des équipements nécessaires...
  • curprev 23:0523:05, 30 November 2021DG Regio talk contribs 13,751 bytes +133 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 14,058 bytes +121 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 13,937 bytes −101 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 14,038 bytes +2,498 Created claim: summary (P836): The main objective of the project is to expand the applicant’s activity to generate electricity and heat from renewable sources with connection of electricity generation to the distribution/transmission network. Energy will be generated both for own purposes (mainly) and for the resale of any surpluses. The project consists of the construction (including the purchase of necessary equipment) of energy generation infrastructure using two RES techn...
  • curprev 21:5321:53, 15 October 2020DG Regio talk contribs 11,540 bytes −2,049 Removed claim: summary (P836): The main objective of the project is to extend the applicant’s activities to generate electricity and heat from renewable sources, and connect the sources of electricity generation to the distribution/transmission network. Energy will be produced both for own account (mainly) and for the resale of possible surpluses. The project consists of the construction (including purchase of the necessary equipment) of the infrastructure used for the gene...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:1107:11, 6 March 2020DG Regio talk contribs 12,310 bytes +2,049 Created claim: summary (P836): The main objective of the project is to extend the applicant’s activities to generate electricity and heat from renewable sources, and connect the sources of electricity generation to the distribution/transmission network. Energy will be produced both for own account (mainly) and for the resale of possible surpluses. The project consists of the construction (including purchase of the necessary equipment) of the infrastructure used for the genera...

24 February 2020

18 February 2020

31 January 2020

14 January 2020