Revision history of "Production of electricity and heat from renewable sources in Seneca" (Q95397)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 74,413 bytes +1 Changed label, description and/or aliases in pt
  • curprev 22:5522:55, 12 October 2024DG Regio talk contribs 74,412 bytes −1 Set a claim value: summary (P836): A empresa foi criada para implementar projectos de investimento. A Seneca pretende entrar no mercado de desenvolvimento e energia. Já realizou documentação preparatória nos domínios acima referidos e é, por conseguinte, considerada uma empresa do setor da energia. Dispõe do PKD e dos recursos adequados para executar o projeto. A empresa obteve uma licença de construção, que inclui componentes de investimento relacionados ao projeto. O projeto é o re...

23 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

3 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:4408:44, 26 July 2022DG Regio talk contribs 69,997 bytes +44,439 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:0423:04, 30 November 2021DG Regio talk contribs 15,631 bytes +2,477 Created claim: summary (P836): L’entreprise a été créée pour réaliser des projets d’investissement. Seneca a l’intention d’entrer sur le marché du développement et de l’énergie. Elle a déjà effectué des travaux préparatoires sur la documentation dans les domaines susmentionnés et peut donc être considérée comme une entreprise énergétique. Il dispose du DP et des ressources nécessaires à la mise en œuvre du projet. L’entreprise a obtenu un permis de construire, qui comprend de...
  • curprev 23:0423:04, 30 November 2021DG Regio talk contribs 13,154 bytes +156 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:2914:29, 17 October 2020DG Regio talk contribs 13,438 bytes +2,220 Created claim: summary (P836): The company was established to implement investment projects. Seneca intends to enter the development and energy market. It has already carried out preparatory documentation in the above-mentioned areas and is therefore considered an energy company. It has the appropriate PKD and resources to implement the project. The company obtained a construction permit, which includes investment components related to the project. The project is the result o...
  • curprev 14:2914:29, 17 October 2020DG Regio talk contribs 11,218 bytes −1,699 Removed claim: summary (P836): The company was set up to implement investment projects. Seneca intends to enter the property and energy market. It has already carried out preparatory documentation in the above-mentioned areas and can therefore be regarded as an energy company. It has the relevant PCA and resources for the implementation of the project. The company has obtained a construction permit which includes investment components related to the project. The project is...

15 October 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:1107:11, 6 March 2020DG Regio talk contribs 11,630 bytes +1,699 Created claim: summary (P836): The company was set up to implement investment projects. Seneca intends to enter the property and energy market. It has already carried out preparatory documentation in the above-mentioned areas and can therefore be regarded as an energy company. It has the relevant PCA and resources for the implementation of the project. The company has obtained a construction permit which includes investment components related to the project. The project is th...

24 February 2020

18 February 2020

31 January 2020

14 January 2020