Revision history of "Wałbrzych Business Incubator" (Q94536)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:0316:03, 13 October 2024DG Regio talk contribs 89,358 bytes −11 Changed label, description and/or aliases in pt
  • curprev 16:0316:03, 13 October 2024DG Regio talk contribs 89,369 bytes −134 Set a claim value: summary (P836): O objeto do projeto é a criação da Incubadora de Empresas Wałbrzych, através da reconstrução e adaptação do edifício em ul. Młynarska 29 em Wałbrzych. No âmbito das obras de construção, demolição do edifício da exploração agrícola situado diretamente junto ao edifício de ul. Mlynarska 29, juntamente com a construção de uma parede de resistência. O projeto prevê igualmente obras de construção relacionadas com o desenvolvimento da área circundante à i...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0223:02, 2 March 2023DG Regio talk contribs 85,972 bytes +3,452 Changed label, description and/or aliases in da, it, sk, bg, et, hr, ga, cs, fr, sv, lv, ro, lt, es, el, fi, de, mt, hu, pt, sl, nl, and other parts

19 October 2022

13 August 2022

  • curprev 18:3918:39, 13 August 2022DG Regio talk contribs 81,704 bytes +51,778 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:1023:10, 30 November 2021DG Regio talk contribs 17,969 bytes +3,006 Created claim: summary (P836): L’objet du projet est la création de l’incubateur d’entreprise Wałbrzych, par la reconstruction et l’adaptation du bâtiment à ul. Młynarska 29 à Wałbrzych. Dans le cadre des travaux de construction, démolition du bâtiment de la ferme directement adjacent au bâtiment à ul. Młynarska 29, y compris la construction d’un mur de soutènement. Le projet prévoit également des travaux de construction liés à l’aménagement de la zone environnante (y compris...
  • curprev 23:1023:10, 30 November 2021DG Regio talk contribs 14,963 bytes +100 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5921:59, 15 October 2020DG Regio talk contribs 15,303 bytes +88 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5921:59, 15 October 2020DG Regio talk contribs 15,215 bytes −79 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5921:59, 15 October 2020DG Regio talk contribs 15,294 bytes +2,683 Created claim: summary (P836): The subject of the project is the creation of the Wałbrzych Business Incubator, through the reconstruction and adaptation of the building at ul. Młynarska 29 in Wałbrzych. As part of the construction work, demolition of the farm building located directly adjacent to the building at ul. Mlynarska 29, along with the construction of a resistance wall. The project also provides for construction works related to the development of the surrounding are...
  • curprev 21:5921:59, 15 October 2020DG Regio talk contribs 12,611 bytes −2,192 Removed claim: summary (P836): The project is the creation of the Wałbrzych Incubator, by reconstructing and adapting the building at ul. Bolska 29 in Wałbrzych. As part of the construction work, the building will be demolished with a building directly adjacent to the building at ul. Bolska 29, with a wall wall. The project also provides for the construction of an environment around the site (including, inter alia, the creation of parking spaces). In order to ensure optimal...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

6 March 2020

  • curprev 07:1507:15, 6 March 2020DG Regio talk contribs 13,085 bytes +2,192 Created claim: summary (P836): The project is the creation of the Wałbrzych Incubator, by reconstructing and adapting the building at ul. Bolska 29 in Wałbrzych. As part of the construction work, the building will be demolished with a building directly adjacent to the building at ul. Bolska 29, with a wall wall. The project also provides for the construction of an environment around the site (including, inter alia, the creation of parking spaces). In order to ensure optimal c...

24 February 2020

18 February 2020

31 January 2020

14 January 2020