Revision history of "Armament of investment areas in the commune of Miękinia" (Q94515)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:0216:02, 13 October 2024DG Regio talk contribs 93,573 bytes −83 Set a claim value: summary (P836): Membrana e Fontes). O âmbito material do projeto inclui: construção de rede de esgotos, rede de abastecimento de água, esgotos teletécnicos e estradas internas com iluminação. No que diz respeito à construção de uma rede de abastecimento de água, a tarefa deve incluir: construção de uma rede de tubos PEHD de 160 mm de diâmetro: • Oleoduto St. Sand – Oleoduto com cerca de 900 m de comprimento, str. Máquina (Miękinia) – conduta com um comprimento de 8...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0223:02, 2 March 2023DG Regio talk contribs 90,125 bytes +1,103 Changed label, description and/or aliases in da, it, sk, cs, lv, hr, es, fi, ro, fr, pt, lt, hu, et, ga, nl, el, sl, sv, bg, de, mt, and other parts

19 October 2022

26 July 2022

  • curprev 08:2608:26, 26 July 2022DG Regio talk contribs 88,208 bytes +56,600 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:1223:12, 30 November 2021DG Regio talk contribs 18,611 bytes +3,294 Created claim: summary (P836): Membrane et sources). Le champ d’application du projet comprend: construction d’un réseau d’assainissement, d’un réseau d’approvisionnement en eau, d’un système d’assainissement télétechnique et de routes intérieures avec éclairage. En ce qui concerne la construction du réseau d’approvisionnement en eau, la tâche comprend: construction d’un réseau d’alimentation en eau d’un diamètre de 160 mm PEHD: • St. Sable (Sources) — longueur du pipeline de...
  • curprev 23:1223:12, 30 November 2021DG Regio talk contribs 15,317 bytes +130 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5921:59, 15 October 2020DG Regio talk contribs 15,627 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5921:59, 15 October 2020DG Regio talk contribs 15,512 bytes −124 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5921:59, 15 October 2020DG Regio talk contribs 15,636 bytes +2,893 Created claim: summary (P836): Membrane and Sources). The project’s material scope includes: construction of sewage network, water supply network, teletechnical sewerage and internal roads with lighting. As regards the construction of a water supply network, the task shall include: construction of a 160 mm diameter PEHD pipe network: • St. Sand Pipeline – Pipeline about 900 m long, str. Machine (Miękinia) – pipeline with a length of 840 m, plugged into the existing water supp...
  • curprev 21:5921:59, 15 October 2020DG Regio talk contribs 12,743 bytes −2,455 Removed claim: summary (P836): Hands and sources). The scope of the project includes: construction of sewage network, water supply, telecommunications and internal roads with lighting. As far as the construction of the water mains network is concerned, the task is to: construction of a 160 mm mm PHD for the water supply network: • ul. Sand (Sources) — pipe length 900 m, ul. Machinery (Mirikinia) — a pipe 840 m long, up to the existing water supply network, the relationship...

23 September 2020

15 September 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

6 March 2020

  • curprev 07:1507:15, 6 March 2020DG Regio talk contribs 13,480 bytes +2,455 Created claim: summary (P836): Hands and sources). The scope of the project includes: construction of sewage network, water supply, telecommunications and internal roads with lighting. As far as the construction of the water mains network is concerned, the task is to: construction of a 160 mm mm PHD for the water supply network: • ul. Sand (Sources) — pipe length 900 m, ul. Machinery (Mirikinia) — a pipe 840 m long, up to the existing water supply network, the relationship be...

24 February 2020

18 February 2020

31 January 2020

14 January 2020