Revision history of "Carrying out development work on the new type A connector to the X series of actuators." (Q94391)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:0216:02, 13 October 2024DG Regio talk contribs 72,380 bytes −7 Changed label, description and/or aliases in pt
  • curprev 16:0216:02, 13 October 2024DG Regio talk contribs 72,387 bytes −46 Set a claim value: summary (P836): A ZPUA Sp. z o.o. planeia realizar trabalhos de desenvolvimento em novas ligações A PA-e, PA-f, PA-F, PA-G à série X de atuadores. O projeto será executado no período de 2.3.2016-31.7.2017 (intervalo de materiais, âmbito financeiro de 30.9.2017) em 4 fases: I.Desenvolvimento de pressupostos e documentação técnica. II. A fazer protótipos. III. Testar protótipos e fazer alterações. IV. Preparação para a execução da primeira produção. Estes trabalhos s...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:0223:02, 2 March 2023DG Regio talk contribs 68,902 bytes +1,311 Changed label, description and/or aliases in lv, it, da, sk, fr, sv, fi, hr, sl, ga, ro, de, et, lt, bg, pt, hu, nl, es, mt, el, cs, and other parts

19 October 2022

26 July 2022

  • curprev 08:2408:24, 26 July 2022DG Regio talk contribs 66,776 bytes +41,251 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:5822:58, 30 November 2021DG Regio talk contribs 16,037 bytes +2,285 Created claim: summary (P836): Dans le cadre de ce projet, ZPUA Sp. z o.o. prévoit de réaliser des travaux de développement de nouvelles connexions A PA-e, PA-f, PA-G au type d’actionneurs X. Le projet sera mis en œuvre au cours de la période du 02.03.2016-31.07.2017 (la portée matérielle, 30.09.2017 portée financière) en 4 étapes: I. Élaboration d’hypothèses et de documentation technique. II. Faire des prototypes. III. Tester des prototypes et apporter des changements. IV. P...
  • curprev 22:5822:58, 30 November 2021DG Regio talk contribs 13,752 bytes +173 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:4821:48, 15 October 2020DG Regio talk contribs 14,019 bytes +146 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4821:48, 15 October 2020DG Regio talk contribs 13,873 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4821:48, 15 October 2020DG Regio talk contribs 14,006 bytes +2,039 Created claim: summary (P836): ZPUA Sp. z o.o. plans to carry out development work on new connections A PA-e, PA-f, PA-F, PA-G to the X series of actuators. The project will be implemented in the period 02.03.2016-31.07.2017 (material range, 30.09.2017 financial scope) within 4 stages: I.Development of assumptions and technical documentation. II. Making prototypes. III. Testing prototypes and making changes. IV. Preparation for implementation for the first production. These w...
  • curprev 21:4821:48, 15 October 2020DG Regio talk contribs 11,967 bytes −1,564 Removed claim: summary (P836): Under this project, ZAUPUA Sp. z o.o. plans to carry out development work on the new A PA-e, PA-f, -PA-G typology, the project will run over the 02.03.2016-31.07.2017 period (material scope, 30.09.2017 financial scope) in 4 stages: Drawing up the assumptions and technical documentation. II. The implementation of prototypes. III. The examination of prototypes and the introduction of changes. IV. Preparation for implementation for the first prod...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

6 March 2020

  • curprev 07:1607:16, 6 March 2020DG Regio talk contribs 11,814 bytes +1,564 Created claim: summary (P836): Under this project, ZAUPUA Sp. z o.o. plans to carry out development work on the new A PA-e, PA-f, -PA-G typology, the project will run over the 02.03.2016-31.07.2017 period (material scope, 30.09.2017 financial scope) in 4 stages: Drawing up the assumptions and technical documentation. II. The implementation of prototypes. III. The examination of prototypes and the introduction of changes. IV. Preparation for implementation for the first produc...

24 February 2020

18 February 2020

31 January 2020

14 January 2020