Revision history of "Technical assistance of PO WER for the Voivodeship Labour Office in Lublin for the years 2019-2020" (Q94331)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:0116:01, 13 October 2024DG Regio talk contribs 48,705 bytes +6 Changed label, description and/or aliases in pt
  • curprev 16:0116:01, 13 October 2024DG Regio talk contribs 48,699 bytes +14 Set a claim value: summary (P836): Assegurar um apoio eficaz na execução do PO WER pelo Gabinete Provincial do Trabalho de Lublin enquanto Instituição Intermediária para o Eixo Prioritário I através de: assegurar uma capacidade institucional adequada (remuneração dos trabalhadores, equipamento dos postos de trabalho, formação, custos das instituições) e assegurar um processo adequado de seleção, controlo, acompanhamento, avaliação e promoção dos projetos.

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 22:2222:22, 2 March 2023DG Regio talk contribs 45,928 bytes +76 Changed label, description and/or aliases in it, da, sk, fi, el, lv, cs, de, ro, bg, ga, pt, fr, sv, sl, hr, et, mt, nl, es, lt, hu, and other parts

19 October 2022

26 July 2022

  • curprev 08:2308:23, 26 July 2022DG Regio talk contribs 45,057 bytes +26,303 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:5722:57, 30 November 2021DG Regio talk contribs 13,258 bytes +1,246 Created claim: summary (P836): Assurer un soutien efficace à la mise en œuvre de l’OP KED par le Bureau du travail de la voïvodie de Lublin, en tant qu’organisme intermédiaire pour l’axe prioritaire I, à travers: garantir une capacité institutionnelle adéquate (rémunération du personnel, équipement de travail, formation, coûts institutionnels) et assurer la sélection, le contrôle, le suivi, l’évaluation et la promotion des projets., translated_summary
  • curprev 22:5722:57, 30 November 2021DG Regio talk contribs 12,012 bytes +147 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:4221:42, 15 October 2020DG Regio talk contribs 12,305 bytes +157 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4221:42, 15 October 2020DG Regio talk contribs 12,148 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4221:42, 15 October 2020DG Regio talk contribs 12,285 bytes +1,191 Created claim: summary (P836): Ensuring effective support in the implementation of PO WER by the Provincial Labour Office in Lublin as the Intermediate Institution for Priority Axis I through: ensure adequate institutional capacity (employee remuneration, equipping jobs, training, costs of institutions) and ensuring the proper process of project selection, control, monitoring, evaluation, promotion., translated_summary
  • curprev 21:4221:42, 15 October 2020DG Regio talk contribs 11,094 bytes −728 Removed claim: summary (P836): Ensure effective support for the implementation of the OP KED by the Regional Labour Office in Lublin as the intermediate body for Priority Axes I by: ensuring adequate institutional capacity (salaries of employees, equipping of jobs, training, institution costs) and ensuring a proper project selection process, control, monitoring, evaluation, promotion., remove_old_english_translation

23 September 2020

16 July 2020

10 June 2020

6 June 2020

26 March 2020

6 March 2020

  • curprev 07:1607:16, 6 March 2020DG Regio talk contribs 10,102 bytes +728 Created claim: summary (P836): Ensure effective support for the implementation of the OP KED by the Regional Labour Office in Lublin as the intermediate body for Priority Axes I by: ensuring adequate institutional capacity (salaries of employees, equipping of jobs, training, institution costs) and ensuring a proper project selection process, control, monitoring, evaluation, promotion., Adding English summary

24 February 2020

18 February 2020

31 January 2020

14 January 2020