Revision history of "Technical assistance of PO WER to the Ministry of Labour and Social Policy for 2015" (Q94293)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 47,688 bytes +10 Changed label, description and/or aliases in pt
  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 47,678 bytes +11 Set a claim value: summary (P836): A prestação de um apoio eficaz à execução do PO WER pelo Ministério do Trabalho e da Política Social enquanto intermediário para o eixo prioritário I (Ação 1.3) e o eixo prioritário II (Ações 2.1, 2.4, 2.5, 2.6, 2.7, 2.8, 2.9) mediante: — assegurar uma capacidade institucional adequada e — assegurar um processo adequado de seleção, controlo, acompanhamento, avaliação e promoção dos projetos

20 March 2024

6 July 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 23:0223:02, 2 March 2023DG Regio talk contribs 45,993 bytes +396 Changed label, description and/or aliases in da, it, lv, sk, hr, et, cs, fi, sv, ro, nl, de, lt, bg, sl, fr, pt, el, ga, hu, mt, and other parts

26 October 2022

19 October 2022

13 August 2022

  • curprev 18:3618:36, 13 August 2022DG Regio talk contribs 43,518 bytes +25,687 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:5922:59, 30 November 2021DG Regio talk contribs 12,333 bytes +1,249 Created claim: summary (P836): Assurer un soutien efficace à la mise en œuvre du PO KED par le ministère du travail et de la politique sociale en tant qu’organisme intermédiaire pour l’axe prioritaire I (action 1.3) et l’axe prioritaire II (actions 2.1, 2.4, 2.5, 2.6, 2.7, 2.8, 2.9): — assurer une capacité institutionnelle adéquate et — assurer le bon processus de sélection, de contrôle, de suivi, d’évaluation, de promotion des projets, translated_summary
  • curprev 22:5922:59, 30 November 2021DG Regio talk contribs 11,084 bytes +141 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5121:51, 15 October 2020DG Regio talk contribs 11,383 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5121:51, 15 October 2020DG Regio talk contribs 11,241 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5121:51, 15 October 2020DG Regio talk contribs 11,388 bytes +1,198 Created claim: summary (P836): The provision of effective support for the implementation of PO WER by the Ministry of Labour and Social Policy as an intermediary for Priority Axis I (Action 1.3) and Priority Axis II (Actions 2.1, 2.4, 2.5, 2.6, 2.7, 2.8, 2.9) by: — ensuring adequate institutional capacity and – ensuring the proper process of project selection, control, monitoring, evaluation, promotion, translated_summary
  • curprev 21:5121:51, 15 October 2020DG Regio talk contribs 10,190 bytes −745 Removed claim: summary (P836): Ensuring effective support for the implementation of OP KED by the Ministry of Labour and Social Policy as the intermediate body for Priority Axes I (Measure 1.3) and Priority Axes II (Measures 2.1, 2.4, 2.5, 2.6, 2.7, 2.8, 2.9) by: — ensuring adequate institutional capacity and — ensuring a proper project selection process, control, monitoring, evaluation, promotion, remove_old_english_translation

10 June 2020

6 June 2020

26 March 2020

6 March 2020

  • curprev 07:0707:07, 6 March 2020DG Regio talk contribs 9,644 bytes +745 Created claim: summary (P836): Ensuring effective support for the implementation of OP KED by the Ministry of Labour and Social Policy as the intermediate body for Priority Axes I (Measure 1.3) and Priority Axes II (Measures 2.1, 2.4, 2.5, 2.6, 2.7, 2.8, 2.9) by: — ensuring adequate institutional capacity and — ensuring a proper project selection process, control, monitoring, evaluation, promotion, Adding English summary

24 February 2020

18 February 2020

31 January 2020

14 January 2020