Revision history of "Technical assistance of the PO WER to the intermediary institution MEN for 2016" (Q94292)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 46,600 bytes +10 Changed label, description and/or aliases in pt
  • curprev 06:4306:43, 13 October 2024DG Regio talk contribs 46,590 bytes −30 Set a claim value: summary (P836): Prestar um apoio eficaz à execução do PO WER pelo Ministério da Educação Nacional enquanto intermediário para o Eixo Prioritário II: — assegurar uma capacidade institucional adequada (emprego, formação, custos das instituições, etc.), — assegurar um processo adequado de seleção, controlo, acompanhamento, avaliação e promoção dos projetos.

20 March 2024

6 July 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 23:2823:28, 2 March 2023DG Regio talk contribs 44,946 bytes +231 Changed label, description and/or aliases in da, it, de, sk, fi, pt, ro, es, bg, lv, ga, el, sv, fr, sl, et, lt, hu, mt, hr, nl, cs, and other parts

26 October 2022

19 October 2022

13 August 2022

  • curprev 18:3618:36, 13 August 2022DG Regio talk contribs 42,638 bytes +25,030 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:5922:59, 30 November 2021DG Regio talk contribs 12,208 bytes +1,233 Created claim: summary (P836): Assurer un soutien efficace à la mise en œuvre du PO KED par le ministère de l’éducation nationale en tant qu’organisme intermédiaire pour l’axe prioritaire II: — assurer une capacité institutionnelle adéquate (équipement des lieux de travail, formation, coûts institutionnels, etc.) — assurer le bon processus de sélection, de contrôle, de suivi, d’évaluation et de promotion des projets., translated_summary
  • curprev 22:5922:59, 30 November 2021DG Regio talk contribs 10,975 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,283 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,145 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,273 bytes +1,159 Created claim: summary (P836): To provide effective support for the implementation of PO WER by the Ministry of National Education as an intermediary for Priority Axis II by: — ensuring adequate institutional capacity (employment, training, costs of institutions, etc.), – ensuring the proper process of project selection, control, monitoring, evaluation, promotion., translated_summary
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 10,114 bytes −709 Removed claim: summary (P836): Ensure effective support for the implementation of OP KED by the Ministry of National Education as the intermediate body for Priority Axes II by: — ensuring adequate institutional capacity (work equipment, training, institution costs, etc.), — ensuring a proper process of project choices, control, monitoring, evaluation, promotion., remove_old_english_translation

25 September 2020

23 September 2020

10 June 2020

6 June 2020

26 March 2020

6 March 2020

  • curprev 07:0707:07, 6 March 2020DG Regio talk contribs 9,543 bytes +709 Created claim: summary (P836): Ensure effective support for the implementation of OP KED by the Ministry of National Education as the intermediate body for Priority Axes II by: — ensuring adequate institutional capacity (work equipment, training, institution costs, etc.), — ensuring a proper process of project choices, control, monitoring, evaluation, promotion., Adding English summary

24 February 2020

18 February 2020

31 January 2020

14 January 2020