Revision history of "Technical assistance of PO WER to the Ministry of Development for 2017" (Q94281)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:5122:51, 12 October 2024DG Regio talk contribs 45,771 bytes +5 Changed label, description and/or aliases in pt
  • curprev 22:5122:51, 12 October 2024DG Regio talk contribs 45,766 bytes −10 Set a claim value: summary (P836): Assegurar um apoio eficaz à execução do PO WER pelo Ministério do Desenvolvimento, enquanto autoridade de gestão do PO WER, através de: — assegurar uma capacidade institucional adequada (emprego, formação, custos das instituições) e — assegurar um processo adequado de seleção, controlo, acompanhamento, avaliação e promoção dos projetos.

22 March 2024

6 July 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 16:5116:51, 2 March 2023DG Regio talk contribs 44,102 bytes −88 Changed label, description and/or aliases in lv, da, it, bg, sk, et, hr, ro, lt, pt, hu, ga, sl, fr, sv, de, el, nl, mt, fi, cs, es, and other parts

26 October 2022

19 October 2022

26 July 2022

  • curprev 08:2208:22, 26 July 2022DG Regio talk contribs 42,113 bytes +24,638 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:2106:21, 1 December 2021DG Regio talk contribs 12,154 bytes +1,209 Created claim: summary (P836): Assurer un soutien efficace à la mise en œuvre de l’OP KED par le ministère du développement en tant qu’autorité de gestion de l’OP KED: — assurer une capacité institutionnelle adéquate (équipement des lieux de travail, formation, coûts de l’institution) et — assurer le bon processus de sélection, de contrôle, de suivi, d’évaluation et de promotion des projets., translated_summary
  • curprev 06:2106:21, 1 December 2021DG Regio talk contribs 10,945 bytes +128 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,257 bytes +129 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,128 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,262 bytes +1,148 Created claim: summary (P836): Ensuring effective support for the implementation of PO WER by the Ministry of Development as the Managing Authority of PO WER through: — ensuring adequate institutional capacity (employment, training, costs of institutions) and – ensuring the proper process of project selection, control, monitoring, evaluation, promotion., translated_summary
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 10,114 bytes −686 Removed claim: summary (P836): Ensure efficient support for the implementation of OP KED by the Ministry of Development as Managing Authority of the OP KED by: — ensuring adequate institutional capacity (job creation, training, institution costs) and — ensuring a proper project selection process, control, monitoring, evaluation, promotion., remove_old_english_translation

23 September 2020

10 June 2020

6 June 2020

26 March 2020

6 March 2020

  • curprev 07:0707:07, 6 March 2020DG Regio talk contribs 9,517 bytes +686 Created claim: summary (P836): Ensure efficient support for the implementation of OP KED by the Ministry of Development as Managing Authority of the OP KED by: — ensuring adequate institutional capacity (job creation, training, institution costs) and — ensuring a proper project selection process, control, monitoring, evaluation, promotion., Adding English summary

24 February 2020

18 February 2020

31 January 2020

14 January 2020