Revision history of "Technical assistance of PO WER to the Ministry of Infrastructure and Development for 2015" (Q94280)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 16:0316:03, 13 October 2024DG Regio talk contribs 46,782 bytes −2 Changed label, description and/or aliases in pt
  • curprev 16:0316:03, 13 October 2024DG Regio talk contribs 46,784 bytes +10 Set a claim value: summary (P836): Assegurar um apoio eficaz à execução do PO WER pelo Ministério das Infraestruturas e do Desenvolvimento, enquanto autoridade de gestão do PO WER, mediante: — assegurar uma capacidade institucional adequada (equipamento de emprego, formação, custos das instituições) e — assegurar um trabalho adequado de seleção, controlo, acompanhamento, avaliação e promoção dos projetos.

12 March 2024

6 July 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 23:0223:02, 2 March 2023DG Regio talk contribs 45,101 bytes −239 Changed label, description and/or aliases in lv, bg, it, da, fi, sk, pt, hr, cs, de, el, fr, hu, sv, lt, ro, et, mt, nl, sl, es, ga, and other parts

26 October 2022

19 October 2022

13 August 2022

  • curprev 18:3618:36, 13 August 2022DG Regio talk contribs 43,263 bytes +25,569 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 06:2106:21, 1 December 2021DG Regio talk contribs 12,261 bytes +1,226 Created claim: summary (P836): Assurer un soutien efficace à la mise en œuvre de l’OP KED par le ministère des infrastructures et du développement en tant qu’autorité de gestion de l’OP KED: — assurer une capacité institutionnelle adéquate (équipement des lieux de travail, formation, coûts institutionnels) et — assurer une sélection, un contrôle, un suivi, une évaluation et une promotion appropriés des projets., translated_summary
  • curprev 06:2106:21, 1 December 2021DG Regio talk contribs 11,035 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,329 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,181 bytes −153 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 11,334 bytes +1,166 Created claim: summary (P836): Ensuring effective support for the implementation of PO WER by the Ministry of Infrastructure and Development as the Managing Authority for PO WER by: — ensuring adequate institutional capacity (employment equipment, training, costs of institutions) and – ensuring proper work of project selection, control, monitoring, evaluation, promotion., translated_summary
  • curprev 21:5021:50, 15 October 2020DG Regio talk contribs 10,168 bytes −699 Removed claim: summary (P836): Ensure efficient support for the implementation of OP KED by the Ministry of Infrastructure and Development as Managing Authority for OP KED by: — ensuring adequate institutional capacity (work equipment, training, institution costs) and ensuring the correct selection of projects, control, monitoring, evaluation, promotion., remove_old_english_translation

10 June 2020

6 June 2020

26 March 2020

6 March 2020

  • curprev 07:0707:07, 6 March 2020DG Regio talk contribs 9,576 bytes +699 Created claim: summary (P836): Ensure efficient support for the implementation of OP KED by the Ministry of Infrastructure and Development as Managing Authority for OP KED by: — ensuring adequate institutional capacity (work equipment, training, institution costs) and ensuring the correct selection of projects, control, monitoring, evaluation, promotion., Adding English summary

24 February 2020

18 February 2020

31 January 2020

14 January 2020