Revision history of "AREAS RAS — IMPROVEMENT OF PROCESSES, UPGRADING, PARTICIPATION AND CAPACITY BUILDING FOR PREVENTION OF CORRUPTION" (Q921821)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:3506:35, 13 October 2024DG Regio talk contribs 46,132 bytes −5 Changed label, description and/or aliases in pt
  • curprev 06:3506:35, 13 October 2024DG Regio talk contribs 46,137 bytes −26 Set a claim value: summary (P836): THIS PROJECT IS DESIGNED TO IMPROVE THE INSTITUTIONAL CAPACITY OF THE REGIONAL SYSTEM TO MEET THE OBLIGATIONS LAID DOWN IN THE THREE-YEAR PLAN FOR THE PREVENTION OF CORRUPTION 2016/2018 THROUGH THE CREATION OF COLLABORATIVE LEARNING PATHWAYS TO STRENGTHEN STRATEGIC AND MANAGERIAL SKILLS IN THE AREAS OF PREVENTION AND COMBATING CORRUPTION.

23 March 2024

10 June 2023

26 April 2023

24 April 2023

8 April 2023

7 December 2022

  • curprev 22:3622:36, 7 December 2022DG Regio talk contribs 42,279 bytes −714 Removed claim: summary (P836): THIS PROJECT IS DESIGNED TO IMPROVE THE INSTITUTIONAL CAPACITY OF THE REGIONAL SYSTEM TO MEET THE OBLIGATIONS LAID DOWN IN THE THREE-YEAR PLAN FOR THE PREVENTION OF CORRUPTION 2016/2018 THROUGH THE CREATION OF COLLABORATIVE LEARNING PATHWAYS TO STRENGTHEN STRATEGIC AND MANAGERIAL SKILLS IN THE AREAS OF PREVENTION AND COMBATING CORRUPTION., Removing duplicated claims

26 July 2022

  • curprev 07:3407:34, 26 July 2022DG Regio talk contribs 42,993 bytes +27,136 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

10 February 2022

9 February 2022

29 January 2022

12 January 2022

20 December 2021

10 December 2021

1 November 2020

8 June 2020

23 March 2020

  • curprev 15:3315:33, 23 March 2020DG Regio talk contribs 9,848 bytes +432 Changed an Item
  • curprev 15:1915:19, 23 March 2020DG Regio talk contribs 9,416 bytes +713 Created claim: summary (P836): THIS PROJECT IS DESIGNED TO IMPROVE THE INSTITUTIONAL CAPACITY OF THE REGIONAL SYSTEM TO MEET THE OBLIGATIONS LAID DOWN IN THE THREE-YEAR PLAN FOR THE PREVENTION OF CORRUPTION 2016/2018 THROUGH THE CREATION OF COLLABORATIVE LEARNING PATHWAYS TO STRENGTHEN STRATEGIC AND MANAGERIAL SKILLS IN THE AREAS OF PREVENTION AND COMBATING CORRUPTION., Adding English summary

20 March 2020

  • curprev 09:0209:02, 20 March 2020DG Regio talk contribs 8,703 bytes +713 Created claim: summary (P836): THIS PROJECT IS DESIGNED TO IMPROVE THE INSTITUTIONAL CAPACITY OF THE REGIONAL SYSTEM TO MEET THE OBLIGATIONS LAID DOWN IN THE THREE-YEAR PLAN FOR THE PREVENTION OF CORRUPTION 2016/2018 THROUGH THE CREATION OF COLLABORATIVE LEARNING PATHWAYS TO STRENGTHEN STRATEGIC AND MANAGERIAL SKILLS IN THE AREAS OF PREVENTION AND COMBATING CORRUPTION., Adding English summary

17 March 2020

10 March 2020

25 February 2020