Revision history of "Program of dual studies in Tourism and Recreation and Management Engineering at the University of Banking in Wrocław" (Q92076)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 October 2022

13 August 2022

  • curprev 18:1718:17, 13 August 2022DG Regio talk contribs 54,650 bytes +29,195 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:5922:59, 30 November 2021DG Regio talk contribs 15,476 bytes +2,606 Created claim: summary (P836): Objectif principal: Compétence de 52 étudiants (32K,20M) participant à l’enseignement supérieur au WSB à Wrocław pour les diplômes TIR et IN’ZARZna I grâce à la participation à des études en alternance répondant aux besoins de l’économie, du marché du travail et de la société d’ici au 30.06.2023.Les principaux résultats et produits sont:-80 ST TIR et IN’ZZZ, qui participeront à des études en alternance -72 ST TIR et IN″ Zarz, le groupe cible (co...
  • curprev 22:5922:59, 30 November 2021DG Regio talk contribs 12,870 bytes +214 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 16:4816:48, 15 October 2020DG Regio talk contribs 13,096 bytes +177 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4816:48, 15 October 2020DG Regio talk contribs 12,919 bytes −177 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4816:48, 15 October 2020DG Regio talk contribs 13,096 bytes +1,376 Created claim: summary (P836): In order to be able to participate in the education of the school in 50, the main results and the products are: 80 ST TIR and INŻ are: 80 ST TIR and INŻ, who will take part in dual studies, which will take part in dual studies – 72 ST TIR and INŻ for which they will increase the competence of the students to take part in dual studies – 72 ST TIR and INŻ. In the case of a project submitted by universities in partnership, the maximum value of the...
  • curprev 16:4816:48, 15 October 2020DG Regio talk contribs 11,720 bytes −1,103 Removed claim: summary (P836): The main objective of the project is to increase the competences of 52 students (32K, 20M) participating in tertiary level education at the WSB level in Wrocław to TIR and INZ ZARZI to the extent that they participate in dual study courses corresponding to the needs of the economy, the labour market and society by 30.06.2023.Main results and outputs are: -80 of the TIR and other management students (72K; 1K; 30M). the project will only be invi...

25 September 2020

23 September 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 06:5906:59, 6 March 2020DG Regio talk contribs 11,536 bytes +1,103 Created claim: summary (P836): The main objective of the project is to increase the competences of 52 students (32K, 20M) participating in tertiary level education at the WSB level in Wrocław to TIR and INZ ZARZI to the extent that they participate in dual study courses corresponding to the needs of the economy, the labour market and society by 30.06.2023.Main results and outputs are: -80 of the TIR and other management students (72K; 1K; 30M). the project will only be invite...

18 February 2020

9 February 2020

31 January 2020

14 January 2020