Revision history of "Works on railway line No. 216 on the Działdowo – Olsztyn section" (Q88501)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2922:29, 12 October 2024DG Regio talk contribs 90,245 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:2922:29, 12 October 2024DG Regio talk contribs 90,248 bytes +125 Set a claim value: summary (P836): O projeto consiste em: — Obras de infraestruturas (na área da infraestrutura ferroviária) que abrangem a reabilitação da linha ferroviária n.o 216 no troço entre o km 1.140 e o km 83.594, incluindo obras em linhas adjacentes na área da estação de Olsztyn Główny (n.os de alcatrão 220, 353, 219 com um comprimento total de 87.704 km); — Obras de estação (na área das infraestruturas das estações), incluindo a construção de estações ferroviárias em Nidzi...

7 March 2024

15 January 2024

13 December 2023

28 June 2023

14 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4622:46, 2 March 2023DG Regio talk contribs 85,763 bytes −2,285 Changed label, description and/or aliases in da, sk, cs, lv, fi, et, pt, sv, hr, de, ga, el, hu, bg, ro, nl, es, lt, mt, sl, and other parts

26 January 2023

25 January 2023

2 December 2022

26 October 2022

20 October 2022

27 September 2022

26 July 2022

  • curprev 05:5505:55, 26 July 2022DG Regio talk contribs 81,043 bytes +52,510 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:0922:09, 30 November 2021DG Regio talk contribs 16,877 bytes +2,928 Created claim: summary (P836): Le projet consiste en: Les travaux d’infrastructure (dans le domaine de l’infrastructure ferroviaire) impliquant la remise en état de la ligne de chemin de fer no 216 sur le tronçon allant du km 1 140 au km 83 594, y compris les travaux sur les lignes voisines dans la zone de la gare Olsztyn Główny (lk. 220, 353, 219 d’une longueur totale de 87,704 km); — Travaux de gare (dans le domaine de l’infrastructure des gares) impliquant la construction...
  • curprev 22:0922:09, 30 November 2021DG Regio talk contribs 13,949 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5215:52, 14 October 2020DG Regio talk contribs 14,247 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5215:52, 14 October 2020DG Regio talk contribs 14,121 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5215:52, 14 October 2020DG Regio talk contribs 14,242 bytes +2,757 Created claim: summary (P836): The Project consists of: — Infrastructure works (in the area of railway infrastructure) covering the rehabilitation of railway line No. 216 in the section from km 1.140 to km 83.594, including works on adjacent lines in the Olsztyn Główny station area (lk no. 220, 353, 219 with a total length of 87,704 km); — Station works (in the area of station infrastructure) including the construction of railway stations in Nidzica, Olsztyn Zachodni and Olsz...
  • curprev 15:5215:52, 14 October 2020DG Regio talk contribs 11,485 bytes −2,004 Removed claim: summary (P836): The project consists of:— Infrastructure works (for rail infrastructure) including rehabilitation of railway line No 216 from km 1,140 to km 83,594, with works on lines adjacent to the centre of Olsztyn Principal (lk No 220, 353, 219 with a total length of 87.704 km);Station works (in the area of station infrastructure) including the construction of stations in Niedzica, the West and Olsztyn Province and the reconstruction of the railway stati...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 12,207 bytes +2,004 Created claim: summary (P836): The project consists of:— Infrastructure works (for rail infrastructure) including rehabilitation of railway line No 216 from km 1,140 to km 83,594, with works on lines adjacent to the centre of Olsztyn Principal (lk No 220, 353, 219 with a total length of 87.704 km);Station works (in the area of station infrastructure) including the construction of stations in Niedzica, the West and Olsztyn Province and the reconstruction of the railway station...

18 February 2020

8 February 2020

31 January 2020

14 January 2020