Revision history of "Works on railway line No. 52 on the Lewki – Hajnówka section" (Q88499)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2806:28, 13 October 2024DG Regio talk contribs 90,479 bytes −3 Changed label, description and/or aliases in pt
  • curprev 06:2806:28, 13 October 2024DG Regio talk contribs 90,482 bytes −358 Set a claim value: summary (P836): O âmbito do projeto inclui obras de infraestrutura que consistem na reabilitação da linha ferroviária n.o 52 no troço entre o km -0,151 (controlo à esquerda de Lewki) e 26,261 km (estação de Hajnówka) com um comprimento de 26,412 km. A secção analisada tem o estatuto de uma linha de significado local. O troço da linha 52 abrangido pelo projeto é de via única. O projeto envolve a reposição da linha ferroviária no tráfego para fins técnicos e de tráfe...

23 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:3516:35, 2 March 2023DG Regio talk contribs 87,670 bytes +5,982 Changed label, description and/or aliases in lv, da, ro, fr, it, cs, bg, sk, hr, sl, et, es, de, lt, fi, nl, sv, el, pt, hu, mt, ga, and other parts

2 December 2022

26 October 2022

20 October 2022

27 September 2022

26 July 2022

  • curprev 05:5505:55, 26 July 2022DG Regio talk contribs 78,370 bytes +49,126 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:0922:09, 30 November 2021DG Regio talk contribs 16,971 bytes +3,144 Created claim: summary (P836): Le projet comprend des travaux d’infrastructure comprenant la remise en état de la ligne de chemin de fer 52 sur le tronçon allant du km -0.151 (branche gauche) au km 26 261 (gare Hajnówka) d’une longueur de 26,412 km. La section analysée a le statut d’une ligne de signification locale. La section de la ligne 52 couverte par le projet est une seule voie. Le projet comprend la remise en circulation de la ligne de chemin de fer pour des besoins te...
  • curprev 22:0922:09, 30 November 2021DG Regio talk contribs 13,827 bytes +106 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5215:52, 14 October 2020DG Regio talk contribs 14,161 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5215:52, 14 October 2020DG Regio talk contribs 14,039 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5215:52, 14 October 2020DG Regio talk contribs 14,149 bytes +2,457 Created claim: summary (P836): The scope of the Project includes Infrastructure Works consisting of rehabilitation of railway line No. 52 in the section from km -0.151 (left control Lewki) to 26.261 km (Hajnówka station) with a length of 26.412 km. The analysed section has the status of a local meaning line. The section of line 52 covered by the Project is single track. The project involves restoring the railway line to traffic for technical and traffic purposes and carrying...
  • curprev 15:5215:52, 14 October 2020DG Regio talk contribs 11,692 bytes −2,207 Removed claim: summary (P836): The scope of the project consists of infrastructure works relating to the rehabilitation of railway line No 52 from km -0,151 (Levins junction signal box) to km 26,261 (Hajnówka station) with a length of 26.412 km.The section in question has the status of local authority.The section of line 52 covered by the Project is one of one.The project is intended to restore the railway line to traffic for technical needs and to perform replacement works...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 12,616 bytes +2,207 Created claim: summary (P836): The scope of the project consists of infrastructure works relating to the rehabilitation of railway line No 52 from km -0,151 (Levins junction signal box) to km 26,261 (Hajnówka station) with a length of 26.412 km.The section in question has the status of local authority.The section of line 52 covered by the Project is one of one.The project is intended to restore the railway line to traffic for technical needs and to perform replacement works f...

18 February 2020

8 February 2020

31 January 2020

14 January 2020