Revision history of "Construction of DK51 in Olsztyn on the section from the junction of ul. Merchandise from St. Leonhard to knot East (S51)" (Q88491)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2922:29, 12 October 2024DG Regio talk contribs 93,336 bytes −6 Changed label, description and/or aliases in pt
  • curprev 22:2922:29, 12 October 2024DG Regio talk contribs 93,342 bytes −43 Set a claim value: summary (P836): O investimento está localizado na parte oriental de Olsztyn e constitui uma ligação necessária entre o sistema rodoviário na DK51 e a circunvalação meridional de Olsztyn implementada pela GDDKiA durante a DK16, relacionada com a remoção do tráfego automóvel da cidade. O escopo básico do projeto inclui: Tarefa 1: Construção da rua Towarowa no troço desde a junção da rua Towarowa com a rua Buddowlana até à estrada circular de Olsztyn: —construção e re...

7 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:3021:30, 2 March 2023DG Regio talk contribs 90,215 bytes +919 Changed label, description and/or aliases in it, da, sk, fr, fi, lv, hr, sv, ga, el, lt, ro, bg, de, et, cs, hu, pt, sl, nl, mt, es, and other parts

26 October 2022

20 October 2022

26 July 2022

  • curprev 05:5505:55, 26 July 2022DG Regio talk contribs 87,180 bytes +56,228 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:0822:08, 30 November 2021DG Regio talk contribs 17,793 bytes +3,323 Created claim: summary (P836): L’investissement est situé dans la partie orientale d’Olsztyn et est une liaison nécessaire entre le réseau routier au sein de DK51 et le contournement d’Olsztyn du sud mis en œuvre par GDDKiA pendant le DK16, relié à la suppression de la circulation routière de la ville. La portée de base du projet comprend: Activité 1: Construction de la rue Towarowa sur la section allant de la jonction de la rue Towarowa et de la rue Construction au périphéri...
  • curprev 22:0822:08, 30 November 2021DG Regio talk contribs 14,470 bytes +184 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5115:51, 14 October 2020DG Regio talk contribs 14,726 bytes +180 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5115:51, 14 October 2020DG Regio talk contribs 14,546 bytes −181 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5115:51, 14 October 2020DG Regio talk contribs 14,727 bytes +2,847 Created claim: summary (P836): The investment is located in the eastern part of Olsztyn and constitutes a necessary link between the road system within the DK51 with the southern Olsztyn ring road implemented by GDDKiA during the DK16, connected with the removal of motor traffic from the city. The basic scope of the Project includes: Task 1: Construction of Towarowa Street on the section from the junction of Towarowa Street with Buddowlana Street to the design Olsztyn ring ro...
  • curprev 15:5115:51, 14 October 2020DG Regio talk contribs 11,880 bytes −2,428 Removed claim: summary (P836): The investment is located in the part of Olsztyn in part and is a necessary link between the road system in DK51 and the section on the southern bypass of Olsztyn in DK16, connected with the removal of car traffic from the city.The main scope of the project is to:Task 1:Construction of an ul.Freight junction on the stretch from the junction of ul.Freight crossing to the projected bypass of Olsztyn:Building and upgrading of intersections with u...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 13,031 bytes +2,428 Created claim: summary (P836): The investment is located in the part of Olsztyn in part and is a necessary link between the road system in DK51 and the section on the southern bypass of Olsztyn in DK16, connected with the removal of car traffic from the city.The main scope of the project is to:Task 1:Construction of an ul.Freight junction on the stretch from the junction of ul.Freight crossing to the projected bypass of Olsztyn:Building and upgrading of intersections with ul....

18 February 2020

8 February 2020

31 January 2020

14 January 2020