Revision history of "Extension of DW 762 on the section: Kielce node south (S7) – border of the municipality of Chęciny" (Q88489)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2806:28, 13 October 2024DG Regio talk contribs 91,704 bytes −8 Changed label, description and/or aliases in pt
  • curprev 06:2806:28, 13 October 2024DG Regio talk contribs 91,712 bytes −72 Set a claim value: summary (P836): O investimento consiste na reconstrução da DW 762, que começa nos passos diretamente atrás da junção de três entradas com a rua. Kielce em Chęciny em km 0 + 000 (quilómetro útil – quilómetro útil km 0 + 000 corresponde ao quilómetro existente de km 15 + 213) e termina na fronteira com o município de Małogoszcz em km 10 + 168. A rota DW 762 dentro dos limites da cidade de Chęciny contorna os edifícios próximos do centro e corre no seu lado norte. O â...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4622:46, 2 March 2023DG Regio talk contribs 88,614 bytes +8,770 Changed label, description and/or aliases in da, sk, it, hr, lv, hu, ro, fi, et, es, ga, fr, mt, el, de, lt, sv, cs, sl, pt, nl, bg, and other parts

26 October 2022

20 October 2022

13 August 2022

  • curprev 17:4717:47, 13 August 2022DG Regio talk contribs 77,723 bytes +47,524 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:0822:08, 30 November 2021DG Regio talk contribs 17,588 bytes +3,194 Created claim: summary (P836): L’investissement consiste en la reconstruction de DW 762, qui commence sur le pas directement derrière l’intersection à trois entrées avec l’ul. Kielce à Chęcinach en km 0+ 000 (distance de travail — km 0+ 000 kilomètres ouvrables correspond au kilomètre existant 15 + 213) et se termine à la frontière avec la municipalité de Małogoszcz au km 10 + 168. La route DW 762 à l’intérieur des limites de la ville de Chęciny évite la construction stricte...
  • curprev 22:0822:08, 30 November 2021DG Regio talk contribs 14,394 bytes +156 Changed label, description and/or aliases in fr: translated_label

26 December 2020

29 October 2020

14 October 2020

  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,684 bytes +161 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,523 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,685 bytes +2,825 Created claim: summary (P836): The investment consists of the reconstruction of DW 762, which starts in the footsteps directly behind the three-intake junction with the street. Kielce in Chęciny in km 0 + 000 (working kilometer – working kilometre km 0 + 000 corresponds to the existing kilometre of km 15 + 213) and ends at the border with the municipality of Małogoszcz in km 10+ 168. Route DW 762 within the boundaries of the city of Chęciny bypasses the close buildings of the...
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 11,860 bytes −2,357 Removed claim: summary (P836): The investment consists of the conversion of DW 762, which starts at the footprint of the existing directly for the three-inlet intersection at ul.Kielce in Cęcina at km 0 + 000 (km 15 + 000 is the timetable for km 0 + 213) and ends at the border with the municipality of Małogoscz at km 10 + 168.The DW 762 route within the boundaries of the town of Chęcina is close to the centre and runs on the northern side of the centre.The scope of the proj...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 12,935 bytes +2,357 Created claim: summary (P836): The investment consists of the conversion of DW 762, which starts at the footprint of the existing directly for the three-inlet intersection at ul.Kielce in Cęcina at km 0 + 000 (km 15 + 000 is the timetable for km 0 + 213) and ends at the border with the municipality of Małogoscz at km 10 + 168.The DW 762 route within the boundaries of the town of Chęcina is close to the centre and runs on the northern side of the centre.The scope of the projec...

18 February 2020

8 February 2020

31 January 2020

14 January 2020