Revision history of "Reconstruction of DW 676 on the border section of the town of Białystok – Supraśl" (Q88484)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 94,500 bytes +10 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 94,490 bytes +148 Set a claim value: summary (P836): O projeto está localizado no território do distrito de Bialystok de Wasilków e Supraśl, de Białystok a Nowodworce, Ogrodniczka, Krasne e Supraśl. Inclui o edifício e expansão. DW 676, juntamente com estradas de engenheiros e infrastr. tech. necessária na odc Bialystok-Supraśl juntamente com bypass m. Ogrodniczka i Krasne (estakada) por aprox. 9,75 milhas. O início em km 10+ 195 da estrada existente e o fim é de aproximadamente 19 + 939 (ligação ao D...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4622:46, 2 March 2023DG Regio talk contribs 91,172 bytes −1,759 Changed label, description and/or aliases in lv, it, da, fi, bg, sk, pt, de, hr, cs, fr, el, mt, nl, sv, et, hu, ro, lt, sl, es, ga, and other parts

26 October 2022

20 October 2022

26 July 2022

  • curprev 05:5505:55, 26 July 2022DG Regio talk contribs 90,821 bytes +59,929 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:0822:08, 30 November 2021DG Regio talk contribs 17,825 bytes +3,282 Created claim: summary (P836): Le projet est situé dans le comté de Białystok district de Wasilków et Supraśl de Białystok en passant par Nowodworce, Ogrodniczka, Krasne et Supraśl. Comprend la construction et l’agrandissement. DW 676 avec la route des objets ing. et la technique infrastr. nécessaire sur la section Bialystok-Supraśl avec le contournement d’Ogrodniczka et Krasne (estacada) environ. C’est 9,75 miles. Le début en km 10 + 195 de la route existante et l’extrémité...
  • curprev 22:0822:08, 30 November 2021DG Regio talk contribs 14,543 bytes +133 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,850 bytes +144 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,706 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,853 bytes +3,043 Created claim: summary (P836): The project is located on the territory of the Bialystok district of Wasilków and Supraśl from Białystok through Nowodworce, Ogrodniczka, Krasne and Supraśl. Includes the building and expansion. DW 676, along with roads of engineers and necessary infrastr. tech. na odc Bialystok-Supraśl along with bypass m. Ogrodniczka i Krasne (estakada) by approx. It’s 9,75 miles. The beginning in km 10+ 195 of the existing road and the end is approx. 19 + 939...
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 11,810 bytes −2,331 Removed claim: summary (P836): The project is located in the town of war between the powiat białostocki, the municipality of Wasilkow and the Supraśl from Białystok, with the amnwore, the bib and brace overalls, Krasne and Supraśl.This includes budget and budget distribution.DV 676 together with the infrastructure at the outlet and the requisite infrastructure at Białystok, including circumventing the bib and brace overalls.9.75 km.The start at km 10 + 195 of the existing r...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 12,854 bytes +2,331 Created claim: summary (P836): The project is located in the town of war between the powiat białostocki, the municipality of Wasilkow and the Supraśl from Białystok, with the amnwore, the bib and brace overalls, Krasne and Supraśl.This includes budget and budget distribution.DV 676 together with the infrastructure at the outlet and the requisite infrastructure at Białystok, including circumventing the bib and brace overalls.9.75 km.The start at km 10 + 195 of the existing roa...

18 February 2020

8 February 2020

31 January 2020

14 January 2020