Revision history of "Reconstruction of the Voivodeship Road No. 682 on the Markowszczyzna – Łapy section" (Q88479)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 90,015 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 90,016 bytes −60 Set a claim value: summary (P836): O projeto de reconstrução de DW682 na zona de Markowszczyzna Łapy inclui um investimento entre o km 2+ 750 e o km 16+ 815, com uma extensão de 14,07 km, que consiste na extensão de DW com a construção de desvios de Uhowo Turośń Dolna e Markowszczyzna. Termina perto do entroncamento previsto na rota da futura circunvalação meridional de Białystok, que faz parte do projeto S19-TEN-T (nó Bialystok Księżyno). O investimento é uma continuação do projeto...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:5616:56, 2 March 2023DG Regio talk contribs 86,906 bytes −1,835 Changed label, description and/or aliases in lv, da, sk, cs, pt, fi, et, hr, sl, el, sv, ro, ga, de, lt, mt, nl, hu, es, bg, and other parts

26 October 2022

20 October 2022

26 July 2022

  • curprev 05:5505:55, 26 July 2022DG Regio talk contribs 86,631 bytes +56,449 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:4921:49, 30 November 2021DG Regio talk contribs 17,533 bytes +3,181 Created claim: summary (P836): Le projet de reconstruction de DW682 au tronçon markowszczyzna Łapa comprend un investissement du km 2+ 750 au km 16+ 815 d’une longueur de 14,07 km, consistant en l’extension de DW avec la construction de contournements d’Uhowo Turośń Dolna et Markowszczyzna. L’investissement s’inscrit dans le prolongement du projet de reconstruction DW678 Bialystok-Kleosin, qui fait partie du projet de reconstruction S19-TEN-T (node Bialystok Księżyno) et s’in...
  • curprev 21:4921:49, 30 November 2021DG Regio talk contribs 14,352 bytes +145 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,647 bytes +145 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,502 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,649 bytes +2,839 Created claim: summary (P836): Project Reconstruction of DW682 to the area of Markowszczyzna Łapy includes an investment from km 2+ 750 to km 16+ 815 with a length of 14.07 km, consisting of the extension of DW with the construction of bypasses Uhowo Turośń Dolna and Markowszczyzna. It ends near the planned junction on the route of the future southern Bypass of Białystok, which is part of the planned S19-TEN-T (Bialystok Księżyno node) The investment is a continuation of the...
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 11,810 bytes −2,353 Removed claim: summary (P836): The construction of the DW682 on the part of Markowczyn’s DW comprises an investment from km 2 + 750 to km 16 + 815 with a length of 14.07 km for the development of DW with the construction of a ring fence. Uhowo Turośń Dolna and Markowzczyn.It ends in the vicinity of the planned junction of the future South white ring road forming part of the planned S19-TEN-T (Białystok node of the Moon) Investment is the continuation of the project being ca...

25 September 2020

23 September 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 12,886 bytes +2,353 Created claim: summary (P836): The construction of the DW682 on the part of Markowczyn’s DW comprises an investment from km 2 + 750 to km 16 + 815 with a length of 14.07 km for the development of DW with the construction of a ring fence. Uhowo Turośń Dolna and Markowzczyn.It ends in the vicinity of the planned junction of the future South white ring road forming part of the planned S19-TEN-T (Białystok node of the Moon) Investment is the continuation of the project being carr...

18 February 2020

8 February 2020

31 January 2020

14 January 2020