Revision history of "“Construction of the DW in Rzeszów on the section from ul. Lubelska Street to St. Warsaw – DK 97 connection with DK 94”" (Q88472)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 90,002 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 90,002 bytes +46 Set a claim value: summary (P836): O projecto diz respeito à construção de uma estrada provincial entre ul. Liubliana e ul. Varsóvia em Rzeszów há muito tempo. 1378,91 m (em km 0 + 038,49 a 1 + 417,40), dos quais: — a adição da segunda estrada do lado sul da rua existente. Sr. Krogulski: 645,86 m (em km 0, + 038,49 a 0 + 684,35) – construção de uma estrada após uma nova via: 733,05 m (em km 0 + 684,35 a 1 + 417,40) e inclui os seguintes elementos: 1. Construção de uma estrada de duas...

22 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4622:46, 2 March 2023DG Regio talk contribs 86,786 bytes −273 Changed label, description and/or aliases in da, it, hr, sk, fi, et, de, ro, sv, pt, el, lv, lt, cs, es, ga, nl, hu, sl, fr, bg, mt, and other parts

26 October 2022

20 October 2022

26 July 2022

  • curprev 05:5505:55, 26 July 2022DG Regio talk contribs 84,958 bytes +55,338 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:4921:49, 30 November 2021DG Regio talk contribs 17,358 bytes +3,141 Created claim: summary (P836): Le projet concerne la construction d’une route provinciale entre ul. Lubelska et ul. Varsovie à Rzeszów pendant longtemps. 1 378,91 m (en km 0 + 038,49 à 1 + 417.40), dont: — la construction de la deuxième route du côté sud de la rue existante. M. Krogulski: 645,86 m (en km 0, + 038.49 à 0 + 684.35) — construction de la route avec une nouvelle empreinte: 733,05 m (en km 0 + 684,35 à 1 + 417.40) et comprend les éléments suivants: 1. Construction...
  • curprev 21:4921:49, 30 November 2021DG Regio talk contribs 14,217 bytes +168 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,489 bytes +186 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,303 bytes −173 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 14,476 bytes +2,776 Created claim: summary (P836): The project concerns the construction of a provincial road between ul. Ljubljana and ul. Warsaw in Rzeszów by a long time. 1378,91 m (in km 0 + 038.49 to 1 + 417.40), of which: — the addition of the second road on the southern side of the existing street. Mr Krogulski: 645.86 m (in km 0, + 038.49 to 0 + 684.35) – construction of a road after a new track: 733,05 m (in km 0 + 684.35 to 1 + 417.40) and includes the following elements: 1. Constructi...
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 11,700 bytes −2,229 Removed claim: summary (P836): The project concerns the construction of a provincial road between ul.Lübeck, ul.Warsaw city in Rzeszów.1 378.91 m (in km 0 + 038,49 to 1 + 417,40), of which:— the construction of the second carriageway on the south side of the existing ul.Krogulski:645.86 m (in km 0, + 038,49 to 0 + 684,35) — construction of the road after the new incident:733.05 m (in km 0 + 684,35 to 1 + 417,40) and includes the following elements:1.Construction of dual car...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 12,641 bytes +2,229 Created claim: summary (P836): The project concerns the construction of a provincial road between ul.Lübeck, ul.Warsaw city in Rzeszów.1 378.91 m (in km 0 + 038,49 to 1 + 417,40), of which:— the construction of the second carriageway on the south side of the existing ul.Krogulski:645.86 m (in km 0, + 038,49 to 0 + 684,35) — construction of the road after the new incident:733.05 m (in km 0 + 684,35 to 1 + 417,40) and includes the following elements:1.Construction of dual carri...

18 February 2020

8 February 2020

31 January 2020

14 January 2020