Revision history of "Construction of Voivodeship Road No. 747 at the Radawiec section – Konopnica junction (S -19)" (Q88466)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 90,577 bytes −3 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 90,580 bytes +1,704 Set a claim value: summary (P836): 747 Iłża – Lipsko – Solec n/Wisła – Opole Lubelskie – Bełżyce – Konopnica, que permite o acesso ao nó de Konopnica durante o troço rodoviário expresso S-19 do km 91 + 159,84 ao km 94 + 925,84, incluindo a segurança ou a reconstrução de equipamento estrangeiro em conflito com as instalações rodoviárias e de engenharia construídas. A execução do projeto inclui a construção de: section of the regional road, etc., intersections with other public roads,...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4622:46, 2 March 2023DG Regio talk contribs 85,707 bytes −29,556 Changed label, description and/or aliases in lv, it, da, sk, fi, pt, ro, hu, et, el, fr, ga, sv, sl, lt, hr, mt, nl, de, cs, bg, es, and other parts

26 October 2022

20 October 2022

26 July 2022

  • curprev 05:5505:55, 26 July 2022DG Regio talk contribs 113,149 bytes +82,679 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:4921:49, 30 November 2021DG Regio talk contribs 18,805 bytes +2,944 Created claim: summary (P836): Le projet concerne la construction d’un nouveau tronçon de la route de voïvodie no 747 Iłża — Leipzig — Solec n/Wisła — Opole Lubelskie — Bełżyce — Konopnica, qui permet d’accéder au carrefour Konopnica à l’intérieur de l’autoroute S-19 du km 91 + 159,84 au km 94 + 925,84, ainsi que la protection ou la reconstruction d’équipements étrangers qui interfèrent avec les structures routières et techniques en cours de construction. La mise en œuvre du...
  • curprev 21:4921:49, 30 November 2021DG Regio talk contribs 15,861 bytes +150 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 16,151 bytes +154 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 15,997 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 16,152 bytes +4,494 Created claim: summary (P836): 747 Iłża – Lipsko – Solec n/Wisła – Opole Lubelskie – Bełżyce – Konopnica, which provides access to the Konopnica junction during the S-19 express road section from km 91 + 159.84 to km 94 + 925.84, including security or reconstruction of foreign equipment conflicting with the road and engineering facilities built. Implementation of the Project includes the construction of: section of the regional road, etc., intersections with other public road...
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 11,658 bytes −1,919 Removed claim: summary (P836): The subject of the project is the construction of a new section of provincial road No 747 Iłża — Lipsko — Soleic n/Wis³a — Opole Lubelskie — Bełżyce — Konopnica to travel to the ‘Konopnica’ junction on the section from km 91 + 159,84 to km 94 + 925,84, together with the security or reconstruction of the foreign equipment at odds with the built path and engineering structures.The implementation of the project involves the construction of:sectio...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 12,295 bytes +1,919 Created claim: summary (P836): The subject of the project is the construction of a new section of provincial road No 747 Iłża — Lipsko — Soleic n/Wis³a — Opole Lubelskie — Bełżyce — Konopnica to travel to the ‘Konopnica’ junction on the section from km 91 + 159,84 to km 94 + 925,84, together with the security or reconstruction of the foreign equipment at odds with the built path and engineering structures.The implementation of the project involves the construction of:section...

18 February 2020

8 February 2020

31 January 2020

14 January 2020