Revision history of "Development of collective transport in Olsztyn – eco-mobility chains" (Q88464)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4622:46, 2 March 2023DG Regio talk contribs 81,361 bytes +23 Changed label, description and/or aliases in it, da, lv, sk, es, ro, cs, fi, et, ga, fr, lt, nl, hu, mt, sv, el, hr, pt, bg, de, sl, and other parts

26 October 2022

20 October 2022

26 July 2022

  • curprev 05:5505:55, 26 July 2022DG Regio talk contribs 79,223 bytes +51,365 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:4821:48, 30 November 2021DG Regio talk contribs 16,485 bytes +2,804 Created claim: summary (P836): Le projet prévoit d’effectuer les tâches suivantes: Activité 1 Construction d’une jonction intégrée à la gare ferroviaire/PKS Tâche 2 Reconstruction et construction d’un réseau routier dans le centre d’Olsztyn — reconstruction de l’ul. De l’argent avec le pont Saint. Jakuba ZADAT 3 Reconstruction et construction du réseau de rues du Centre Olsztyn — construction d’ul. Tâche 4 Acquisition de matériel roulant de tramway Tâche 5 Élargissement du sy...
  • curprev 21:4821:48, 30 November 2021DG Regio talk contribs 13,681 bytes +138 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 13,983 bytes +129 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 13,854 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 13,980 bytes +2,513 Created claim: summary (P836): The project plans to carry out the following tasks: Task 1 Construction of an integrated interchange node at the railway station/PKS Task 2 Reconstruction and construction of the street system in Centrum Olsztyn – reconstruction of ul. Cash along with the St. Jakuba Task 3 Reconstruction and construction of the street system in the Olsztyn Centre – construction of ul. Partisans Task 4 Purchase of tram rolling stock Task 5 Expansion of the ITS sy...
  • curprev 15:4315:43, 14 October 2020DG Regio talk contribs 11,467 bytes −2,204 Removed claim: summary (P836): The project will carry out the following tasks:Activity 1 Construction of an integrated connecting hub at PKP/PKS Zadanie 2 Construction and construction of a street system at the Centre Olsztyn — reconstruction of ul.Cash together with the ST’s bridgeJakub Task 3: construction and construction of the street system in the Olsztyn Centre — construction of ul.Partyzantów Zadanie 4 Purchase of rolling stock 5 for the construction of a 6 D technol...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 12,384 bytes +2,204 Created claim: summary (P836): The project will carry out the following tasks:Activity 1 Construction of an integrated connecting hub at PKP/PKS Zadanie 2 Construction and construction of a street system at the Centre Olsztyn — reconstruction of ul.Cash together with the ST’s bridgeJakub Task 3: construction and construction of the street system in the Olsztyn Centre — construction of ul.Partyzantów Zadanie 4 Purchase of rolling stock 5 for the construction of a 6 D technolog...

18 February 2020

8 February 2020

31 January 2020

14 January 2020